Similar Projects
Mount Rainier Resort - Phase I
New Construction, Infrastructure
Conception
$230,000,000 CJ est. value
Tacoma, WA 98401

Wastewater Treatment Plant Upgrade Phase 2 - City of Kennewick
Renovation
Conception
$28,870,000 CJ est. value
Kennewick, WA 99336

Cedar Hills Leachate Lagoon- Lagoon Upgrade
Renovation
Design
$3,500,000 est. value
WA

West Point Treatment Plant Primary Sedimentation Tank Coating
Renovation
Design
$3,700,000 est. value
WA

EWU Chilled Water Capacity Upgrade Phase 2
Renovation
Bidding
$2,500,000 CJ est. value
Cheney, WA 99004

Purchase and Repair of PRV (Pressure Relief Valves)
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Issaquah, WA 98029

WWTP Ultraviolet Disinfection Replacement
New Construction
Post-Bid
$1,400,000 to $1,700,000 est. value
Leavenworth, WA

Replace an Existing UV Disinfection System
New Construction
Post-Bid
Richland, WA

Interbay Forcemain and Odor Control Project
Renovation
Results
$1,100,000 est. value
WA

WWTP Digester 4
New Construction
Results
$13,244,000 est. value
Wenatchee, WA

RFP Construction Manager - GC/CM Services for West Point Treatment Plant (WPTP)
New Construction, Infrastructure
Construction
$7,000,000 CJ est. value
Seattle, WA 98199

Bujacich Sewage Lift Station 17 - City of Gig Harbor
Renovation, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Gig Harbor, WA 98335

Mount Rainier Resort- Lodge/ Conference Center
New Construction, Infrastructure - 52,000 SF
Conception
$300,000,000 CJ est. value
Tacoma, WA 98401

Kwina Road WWTP MBR System Improvements
Renovation
Design
$50,000 CJ est. value
Bellingham, WA 98225

2023 Overlay Project
Infrastructure
Bidding
$1,700,000 CJ est. value
Seatac, WA 98188

Last Updated 05/04/2023 04:12 PM
Project Title

Wastewater Treatment Plant and Lift Stations Upgrade

Physical Address View project details and contacts
City, State (County) Pe Ell, WA 98572   (Lewis County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $993,916 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of various upgrades, replacements, and construction at the Town's Wastewater Treatment Plant and two additive schedules of work for the two lift stations, located on 3rd Street and 6th Avenue. The Work shall be substantially complete within 100 working days after the commencement date stated in the Notice to Proceed. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "Town of Pe Ell" and in an amount of not less than five percent (5%) of the total Proposal amount. All work performed on the project will be subject to the higher of prevailing state or federal DavisBacon wage rates

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents