Similar Projects
Infrastructure Improvements - James Hardie Building Products
New Construction, Infrastructure
Bidding
$1,800,000 est. value
Pulaski, VA

Cleaning and Inspection of the ACSA's Water Storage Tanks
Post-Bid
Charlottesville, VA

Water Tank Fall Protection Systems Annual Inspections and As Needed Repair Services
Term Contract, Infrastructure
Post-Bid
Fairfax, VA

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Huguenot Road Pump Station and Tank
Construction
Chesterfield, VA 23832

Brine Storage Tank - Pittsylvania County
Infrastructure
Post-Bid
VA

Rehabilitation and Repainting of Annandale Reservoirs 1 and 2
Results
Fairfax, VA 22031

Creighton Road WST Recoating and Rehabilitation
Infrastructure, Alteration
Post-Bid
Mechanicsville, VA 23111

Hampton Boulevard Water Storage Tank
Results
Less than $6,350,000 est. value
Norfolk, VA 23505

Jennings Randolph Lake RWCC Water Storage Tank Replacement
Alteration
Post-Bid
Hampton, Newport News, VA

BLRI 2021 Cyclic Water Tank Cleaning
Results
VA

Wilson Road Water Tank Rehabilitation
Renovation
Post-Bid
Smithfield, VA

Construction of the Eagle Rock Water Storage Tank Replacement
Results
$300,000 to $399,999 est. value
Eagle Rock, VA 24085

Mayfield and Food Lion Elevated Tanks TTHM Removal System
Infrastructure
Post-Bid
$250,000 est. value
South Hill, VA

Reported 07/05/2022 11:24 AM
Project Title

Moore's Creek Advanced Water Resource Recovery Facility Miscellaneous Concrete Repair - Rivanna Water and Sewer Authority

Physical Address View project details and contacts
City, State (County) Charlottesville, VA 22902   (Albemarle County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $2,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Charlottesville, Virginia. Conceptual plans call for site work for a water / sewer project. The two Holding Ponds and the two Equalization Basins were built with the 1977 Moores Creek Upgrades and are critical to the plant infrastructure to contain wet weather flows. The 40-year old concrete is showing signs of degradation. Following inspections in Fall 2020, Hazen recommended implementation of concrete repairs to extend the life of the concrete basins. Work will include crack repair, spalling repair, joint repair, and coating of miscellaneous metals and valves. This project is in included in the Rivanna Water and Sewer Authority FY 2023-2027 Capital Improvement Plan (CIP). As of July 01, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents