Similar Projects
6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

Ingleside Drive South West Pavement Improvements
Design
$250,000 est. value
Cedar Rapids, IA 52404

Lindale Trail Phase II from I-380 to Council Street North East
Design
$1,200,000 est. value
Cedar Rapids, IA

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

Edgewood Road NW from Ellis Road to Cedar River Bridge Pavement Rehabilitation
Results
$1,380,000 est. value
Cedar Rapids, IA 52407

FY 2022 Pavement Patching
Results
$1,400,000 est. value
Cedar Rapids, IA

Duane Arnold Solar I
New Construction, Infrastructure
Pending Verification
$64,000,000 CJ est. value
Palo, IA 52324

Phase 4 - Tower Terrace Road from C Avenue to W/o Barnsley Lane
Conception
$6,400,000 est. value
Cedar Rapids, IA 52407

Wiley Boulevard Trail from Williams Boulevard to 16th Street SW
Design
$1,293,385 est. value
Cedar Rapids, IA 52407

M-HMA Patching
Infrastructure
Post-Bid
Cedar Rapids, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

Blairs Ferry Road Improvements and 18Th Avenue Extension
Conception
$333,000 est. value
Cedar Rapids, IA 52407

E Avenue North East from 19th Street to 20th Street
Design
$1,650,000 est. value
Cedar Rapids, IA 52402

Last Updated 10/20/2022 02:32 PM
Project Title

E Avenue Northwest from Jacolyn Drive to Wiley Boulevard - 3012187 - City of Cedar Rapids

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52405   (Linn County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes road reconstruction, and replaces the existing ditches with curb, gutter and drainage. A roundabout is proposed at the intersection of E Avenue NW and Wiley Boulevard. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of October 20, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents