Similar Projects
Cardnell Substation - Materials
Post-Bid
Glenwood Springs, CO 81601

Sep Briargate Substation Control Enclosure
New Construction
Bidding
CO

Poncha Substation Stage 04
Results
$500,000 to $1,000,000 est. value
Poncha Springs, CO

Design-Build of “Eastside” Distribution Substation
Term Contract
Results
Fountain, CO 80817

East Substation E1 Transformer Replacement
Results
Loveland, CO 80537

AULT-Badwater-North Cody Equipment Install
Results
$1,000,000 to $5,000,000 est. value
CO

Horizon Substation Control Enclosure
New Construction
Bidding
CO

Horseshoe Electrical Substation Improvement Project
Results
Loveland, CO 80537

Midway KV1A Replacement
New Construction
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Purchase of Materials for the Cardnell Substation
Term Contract
Post-Bid
Glenwood Springs, CO 81601

Cardnell Substation Construction - Installation
Results
Glenwood Springs, CO 81601

Horseshoe Electric Substation Improvement
Results
Loveland, CO 80537

Rattlesnake Solar - Hudson
New Construction
Construction
Hudson, CO

Reported 04/24/2021 12:00 AM
Project Title

Construction Services for The Second Controllable Grid Interface (CGI) Project at The NREL Flatirons Campus

Physical Address View project details and contacts
City, State (County) Boulder, CO   (Boulder County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Electric Substation
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will construct civil and electrical infrastructure for medium voltage electrical equipment (purchased by NREL and installed by contractor) associated with a 19.9 MW CGI electrical grid research capability. The construction services needed are related to those required for an electrical substation and include sitework, concrete foundations, underground electrical vaults, conduit and wiring and equipment installation. The equipment to be installed includes an e-house, three transformers, electrical filters and switchgear. The Second CGI will be interconnected to the Flatirons Campus internal electrical buses utilizing existing and new switches to enable parallel operations with the existing CGI as well as independent operations of each CGI simultaneously with various combinations of connected research articles and equipment.

Details

Electric Substation, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Power Distribution Units, Transfer Switches.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents