Similar Projects
Last Updated | 06/30/2021 09:38 AM |
Project Title | Scheduled and Emergency Guardrail and Fence Repairs and Improvements at Various Locations |
Physical Address | View project details and contacts |
City, State (County) | (Essex, Middlesex Counties) |
Category(s) | Heavy and Highway, Single Trades |
Sub-Category(s) | Fencing, Highway Signs/Guardrails/Barriers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $967,447 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "406.000","Hr","Laborer","100.002" "10.000","Cy","Unclassified Excavation","120.1" "10.000","Cy","Concrete Excavation","127." "8.000","Cy","Class b Rock Excavation","144." "32.000","Cy","Gravel Borrow - Type c","151.01" "8.000","Ton","Disposal Of Treated Wood Products","184.1" "31.000","Ea","Guardrail Post - Modified Installation","602.3" "3700.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "1480.000","Ft","Guardrail, Tl-3 (Single Faced)","620.13" "100.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "100.000","Ft","Guardrail - Curved, Tl-3 (Single Faced)","620.33" "200.000","Ft","Guardrail, Tl-2 (Double Faced)","621.12" "200.000","Ft","Guardrail, Tl-3 (Double Faced)","621.13" "5.000","Ea","Trailing Anchorage","627.1" "3.000","Ea","Steel w Beam Terminal Section (Single Faced)","627.11" "3.000","Ea","Steel Thrie Beam Terminal Section (Single Faced)","627.3" "3.000","Ea","Steel Thrie Beam Terminal Section (Double Faced)","627.4" "3.000","Ea","Steel Highway Guard Transition Beam","627.6" "2.000","Ea","Guardrail End Treatment, Tl-2 (Double Faced)","627.72" "2.000","Ea","Guardrail End Treatment, Tl-3 (Double Faced)","627.73" "2.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "2.000","Ea","Guardrail Tangent End Treatment, Tl-3","627.83" "2.000","Ea","Guardrail Flared End Treatment, Tl-2","627.92" "2.000","Ea","Guardrail Flared End Treatment, Tl-3","627.93" "2.000","Ea","Transition To Nchrp 350 Guardrail","628.21" "2.000","Ea","Transition To Rigid Barrier (Single Faced)","628.22" "2.000","Ea","Transition To Rigid Barrier (Double Faced)","628.23" "2.000","Ea","Transition To Bridge Rail","628.24" "2.000","Ea","Transition To Thrie Beam","628.25" "3.000","Ea","Impact Attenuator For Median, Capable Of Redirection","628.34" "3.000","Ea","Thrie Bullnose System","628.7" "351.000","Ft","Highway Guard Removed And Reset","630." "5000.000","Ft","Highway Guard Removed And Discarded","630.2" "405.000","Ea","Guardrail Post - Steel","632." "60.000","Ea","Guardrail Post - Wood","632.1" "180.000","Ea","Individual Post Removed And Discarded","632.4" "31.000","Ea","Guardrail Offset Block - w Beam","633." "140.000","Ea","Guardrail Offset Block - Thrie Beam","633.1" "290.000","Ea","w Beam Guard Panel","634." "245.000","Ea","Thrie Beam Guard Panel","634.1" "400.000","Ft","Protective Screen (Chain Link)","638.1" "300.000","Ft","36 Inch Snow Fence - 1 Inch Mesh","638.150" "250.000","Ft","36 Inch Snow Fence - 2 Inch Mesh","638.151" "250.000","Ea","48 Inch Snow Fence - 1 Inch Mesh","638.153" "200.000","Ft","48 Inch Snow Fence - 2 Inch Mesh","638.154" "4.000","Ea","Snow Fence At Dry Stand Pipe","638.310" "4.000","Ea","Snow Fence At Large Sign Support Haunch With Cabinets","638.320" "4.000","Ea","Snow Fence At Bridge Expansion Joint","638.330" "4.000","Ea","Snow Fence At Haunch With Gate","638.340" "300.000","Ft","36 Inch Chain Link Fence (Stw) On Concrete Barrier","644.038" "400.000","Ft","48 Inch Chain Link Fence (Stw) On Concrete Barrier","644.049" "750.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) (Line Post Option)","644.072" "750.000","Ft","48 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.148" "750.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.172" "750.000","Ft","96 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.196" "600.000","Ea","72 Inch Chain Link Fence (Stw) With (Modified Post Option)","645.050" "250.000","Ft","Fence Pipe Top Rail - Galvanized","646.072" "250.000","Ft","Fence Pipe Top Rail - Vinyl Coated","646.073" "150.000","Ft","72 Inch Chain Link Gate With Gate Posts","650.072" "150.000","Ft","48 Inch Chain Link Gate With Gate Posts Vinyl Coated","650.148" "150.000","Ft","72 Inch Chain Link Gate With Gate Posts Vinyl Coated","650.172" "150.000","Ft","96 Inch Chain Link Gate With Gate Posts Vinyl Coated","650.196" "150.000","Ea","72 Inch Chain Link Fence End Post","652.072" "40.000","Ea","72 Inch Chain Link Fence Corner Or Intermediate Brace Post","653.072" "500.000","Ft","72 Inch Chain Link Fence Fabric","654.072" "160.000","Ft","96 Inch Wooden Stockade Fence (Line Post Option)","658.01" "800.000","Ft","Barbed Wire For Chain Link Fence","659." "50.000","Ft","48 Inch Wooden Shadowbox Fence","659.048" "50.000","Ft","72 Inch Wooden Shadowbox Fence","659.072" "50.000","Ft","96 Inch Wooden Shadowbox Fence","659.096" "50.000","Ft","120 Inch Wooden Shadowbox Fence","659.120" "1000.000","Ft","Chain Link Fence Removed And Discarded","665.200" "300.000","Ft","Chain Link Fence Removed And Reset","666." "1000.000","Ft","Fence Removed And Discarded","669.1" "12.000","Ea","Emergency Response","748.1" "120.000","Ft","Sediment Control Barrier","767.121" "150.000","Ea","Demountable Reflectorized Delineator - Guard Rail","833.5" "60.000","Ea","Delineation For Guard Rail Termini","833.7" "60.000","Hr","Roadway Flagger","850.41" "80.000","Day","Traffic Cones For Traffic Management","851.1" "300.000","Sf","Safety Signing For Traffic Management","852." "80.000","Day","Truck Mounted Attenuator","853.403" "40.000","Day","Temporary Illumination For Work Zone","853.8" "250.000","Day","Arrow Board","856." "300.000","Day","Reflectorized Drum","859." "40.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "5.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete For Post Foundation","901.3" |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |