Similar Projects
Wastewater Dewatering System
New Construction
Bidding
Bayard, NM

On-Call Construction Services
Post-Bid
Albuquerque, NM 87107

Wastewater Lagoon Improvements Phase 3
Renovation
Post-Bid
Santo Domingo Pueblo, NM 87052

Wastewater Treatment Plant New Effluent Line 2019
Results
Los Lunas, NM 87031

Chama Wastewater Treatment Lagoon Closure - Phase II
Results
Less than $442,500 est. value
Chama, NM 87520

Rehabilitating and/or Developing New Wastewater Collection Infrastructure
Post-Bid
Jemez Pueblo, NM 87024

Construction of the Acomita WWTP Expansion Project
Results
Acomita, NM 87034

South Lagoon Improvements Phase 1
Post-Bid
Santa Clara Pueblo, NM

Rotary Drum Thickener Facility
Term Contract
Results
Albuquerque, NM 87102

Edgewood Wastewater Treatment Plant Improvements Package 1
Post-Bid
Edgewood, NM 87015

Alto Crest Water Treatment Plant (Plant 3) Rehabilitation
Results
Less than $3,529,000 est. value
Ruidoso, NM 88345

Wastewater Treatment Plant (WWTP) - Equipment Procurement
Post-Bid
Edgewood, NM 87015

Construction Services to Upgrade the Wastewater Aeration System at the Paseo Real Wastewater Treatment Plant
Results
$10,753,875 est. value
Santa Fe, NM 87505

Wastewater Treatment Facility
Post-Bid
Jemez Pueblo, NM 87024

Bayard Wastewater Treatment Plant Sludge Dewatering Facilities
Results
Bayard, NM 88023

Last Updated 12/07/2020 10:19 AM
Project Title

Pueblo Los Cerros Homeowners Association - Sewage Treatment Plant Replacement

Physical Address View project details and contacts
City, State (County) Corrales, NM 87048   (Sandoval County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Storm/Sewers
Contracting Method Competitive Bids.
Project Status All Submissions Received, Selection Underway
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of constructing a new duplex pump lift station, installation of approximately 5,000 LF of 4" diameter HDPE force main and subsequent removal and disposal of the existing sewage treatment plant.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Precast Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents