Similar Projects
Gymnasium Renovations and Asbestos Abatement at Cliffside Park HS
Renovation
Bidding
Cliffside Park, NJ 07010

Leonia MS Conversion of Library into Classrooms
Renovation
Bidding
Leonia, NJ 07605

East Rutherford Referendum Projects
Renovation, Addition
Sub-Bidding
Less than $25,500,000 est. value
East Rutherford, NJ 07073

Locker Room and Athletic Suite Renovations
Renovation
Sub-Bidding
Less than $1,850,000 est. value
Ramsey, NJ 07446

Toilet Room Renovations at Various Schools
Renovation
Post-Bid
Ridgefield Park, NJ

MDPK - New Culinary Arts Classroom
Post-Bid
Less than $200,000 est. value
Midland Park, NJ 07432

Unisex ADA Toilet Upgrades at Pascack Hills High School
Results
Montvale, NJ 07645

New Elevator Addition and Alterations at Eugene Field
Renovation, Addition - 14,000 SF
Results
Less than $2,500,000 est. value
Teaneck, NJ 07666

Fair Lawn Board of Education/ Contract 167-Additions at Thomas Jefferson Middle School
Addition
Construction
$9,970,000 est. value
Fair Lawn, NJ

Fair Lawn Board of Education/ Contract 166 - Additions at Memorial Middle School
Addition
Construction
$9,460,000 est. value
Fair Lawn, NJ 07410

Girls Locker Room Renovation at Indian Hills High School and Girls Locker Room Renovation at Ramapo High School
Renovation - 6,125 SF
Post-Bid
Less than $1,615,500 est. value
Oakland, NJ 07436

Auditorium and Media Center Renovations
Renovation
Results
Glen Rock, NJ 07452

Emerson Jr/Sr High School Addition And Alteration
Renovation, Addition
Construction
Emerson, NJ 07630

Life Skills Classroom Renovation
Renovation
Post-Bid
$300,000 est. value
Midland Park, NJ 07432

Front Entry Reconstruction at Woodcliff Middle School
Renovation
Results
Less than $1,100,000 est. value
Woodcliff Lake, NJ 07677

Last Updated 02/15/2021 08:51 AM
Project Title

6th and 7th Grade Science Lab Renovations at Eric S. Smith Middle School

Physical Address View project details and contacts
City, State (County) Ramsey, NJ 07446   (Bergen County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Permitting, Construction Start Expected second quarter 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The new work generally consists of the re-construction of 7 classroom to create equal Science Labs for the 6th and 7th grades at the Middle School. All services will be connected within the same wing of the school. The mechanical design includes 7 rooftops units and related ductwork. Finishes include standard painted exposed decking and VCT flooring.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents