Similar Projects
Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

Joint and Spall Repair - US 18
Infrastructure
Design
$2,569,000 CJ est. value
Martin, SD 57551

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

34th Avenue Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Brookings, SD 57006

Signing and Delineation
Infrastructure
Conception
$1,019,000 CJ est. value
Martin, SD 57551

Bennett County Hospital Remodel/Addition
Addition, Demolition, Renovation, Infrastructure - 19,650 SF
Bidding
$10,000,000 CJ est. value
Martin, SD 57551

Fire Hydrants
Infrastructure
Post-Bid
SD

Last Updated 03/21/2023 07:45 AM
Project Title

Mill, AC Resurfacing, Pipe Work

Physical Address View project details and contacts
City, State (County) Clark, SD 57225   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $6,536,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US212 - Fm the E City Limits of Clark to the Beginning of the Concrete near Watertown. As of March 21, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill, AC Resurfacing, Pipe Work *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents