Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Full Service Design IDIQ
New Construction
Design

Right of Way Acquisition Services Pool
Infrastructure
Bidding

Contractor Structural and Geotechnical Repairs Pool
Term Contract
Bidding

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--Idaho, NIFC & Utah A&E IDIQ
Results
$2,500 to $5,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Comprehensive Update to Provo City General Plan
Post-Bid
Less than $150,000 est. value
Provo, UT

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

Cultural and Environmental MATOC
Term Contract
Design

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Architect-Engineer Indefinite Delivery/Indefinite Quantity Contract For the States Covered by EPA Regions 1 through 4
Post-Bid
Less than $40,000,000 est. value

Last Updated 12/04/2021 01:22 AM
Project Title

I-15 Springville - Spanish Fork Interchange

Physical Address View project details and contacts
City, State (County) Springville, UT 84663   (Utah County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

UDOT is concluding an Environmental Assessment (EA) to evaluate a new interchange on I-15 in order to alleviate congestion at the Springville 400 S Interchange on I-15, improve mobility and access to I-15, improve safety and provide active transportation facilities along the 1600 South/2700 North corridor. UDOT anticipates a phased approach to achieving the build out of the preferred alternative. The design/construction phases include: Phase 1: Design/construction of a diamond type interchange using the existing bridge over I-15 including on/off ramps, realignment of the frontage roads, and respective right of way acquisition to achieve these goals, Design/construction of a grade-separated bridge over a dual-track railroad. Phase 2: Design/construction of the remaining elements of the EA preferred alternative including removing and replacing the existing bridge over I-15 with a new bridge to accommodate a SPUI type interchange, adding north and southbound auxiliary lanes on I-15 as identified in the EA, and expanding the 1600 S/2700 N corridor to a five-lane facility.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents