Similar Projects
Section/Corridor Improvements - SC 146 - S-183 (Roper Mountain Rd) to S-654 (Bagwell Rd)
Alteration
Conception
$1,600,000 est. value
Taylors, SC

Zoo Walkway Repaving - City of Greenville
Alteration
Conception
$366,500 est. value
Greenville, SC 29601

Brake Lane and Slope Hill
Infrastructure
Post-Bid
Greenville, SC

Travelers Rest Downtown Overlay
Infrastructure
Post-Bid
Travelers Rest, SC

Safety Improvement at S-279
Infrastructure
Results
SC

GA Development Area-Phase 1A Paving
Alteration
Results
Greer, SC

Stone Avenue Improvements - City of Greenville
Alteration
Conception
$250,000 est. value
Greenville, SC 29613

Augusta Street Streetscape Phase 1 - Road Diet Restriping
Infrastructure
Post-Bid
Greenville, SC 29613

Safety Improvements - Spartanburg/Greenville County
Infrastructure
Results

Municipal Match Resurfacing Program and GLDTC 596 Resurfacing
Infrastructure
Post-Bid
$9,000,000 to $11,000,000 est. value
Greenville, SC

Greenville Legislative Delegation Transportation Committee MMRP FY 21/22 - 588.02
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
Fountain Inn, SC

Safety Improvements - District 3
Infrastructure
Results

Safety Improvements - I-85 (Anderson/Greenville Co)
Infrastructure
Results

Safety Improvements - US 25
Infrastructure
Results
SC

Reconstruction/Rehabilitation - Greenville CO
Infrastructure
Results
SC

Reported 07/14/2022 08:58 AM
Project Title

Augusta Street Improvements - City of Greenville

Physical Address View project details and contacts
City, State (County) Greenville, SC 29613   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $650,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Greenville, South Carolina. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. Augusta Street Improvements ($650,000) - This project expands on the road diet restriping project between Church Street and Crystal Avenue. In the "residential section", curbs will be moved in four feet on each side providing room for multi-use sidewalks, improved drainage, and improved sight distance at unsignalized intersections. In the "commercial section", lane drops will be utilized to provide turn lanes and limit left turns to key intersections. Landscaped and concrete medians will be utilized throughout the corridor.. This project is in included in the City of Greenville FY 2022-23 Capital Improvement Plan (CIP). As of July 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents