Last Updated | 01/20/2022 04:18 AM |
Project Title | Bridge Replacement - CCS |
Physical Address | View project details and contacts |
City, State (County) | IA (Lee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 0001 Roadway Items - Bros-swap-2697(630)--se-56 Items for a 80'-0 X 30'-0 Continuous Concrete Slab Bridge W/ 5' Sidewalks - Bros-swap2697(630)--se-56 0002 Items for a for a 75'-0 X 30'-0 Continuous Concrete Slab Bridge W/ 5' Sidewalks - Brm-swap2697(634)--sd-56 0003 0004 Roadway Items - Brm-swap-2697(634)--sd-56 In the City of Fort Madison, on 27th St, Over Dry Creek 1.00 Each Aprons 48.84 Units Clearing & Grubbing 1.00 Lump Sum Construction Survey 32.00 Square Yard Drives, P.c.c. 500.00 Linear Foot Electrical Curcuits 650.00 Square Yard Engineering Fabric 1,469.00 Cubic Yard Excavation Class 10 166.00 Cubic Yard Excavation Class 20 102.00 Linear Foot Fence, Chain Link 8.00 Each Handhole 3.00 Each Intakes & Manholes/utility Access 192.00 Cubic Yard Modified Subbase 0.18 Acre Mulching 889.00 Square Yard Pavement, P.c.c. 700.00 Linear Foot Pile, Steel H, 10 in. 660.00 Linear Foot Pile, Steel H, 12 in. 182.30 Linear Foot Rail, Concrete Barrier 307.00 Linear Foot Rail, Metal 64.00 Pound Reinforcing Steel 63,349.00 Pound Reinforcing Steel, Epoxy Coated 1,375.00 Square Yard Removal of Pvmnt/drives/sdwk 450.00 Ton Revetment 0.18 Acre Seeding & Fertilizing 119.00 Linear Foot Sewer, Storm 0.39 Station Shoulder Finishing 165.00 Square Yard Sidewalk, P.c.c. 298.00 Linear Foot Silt Fence 313.70 Cubic Yard Structural Concrete 270.00 Linear Foot Subdrain, Longitudinal 50.00 Cubic Yard Topsoil, Strip/salvage/spread Bros-swap-2697(630)--se-56 Route: F Avenue In the City of Fort Madison, on Avenue F, Over French Creek 2.00 Each Aprons 0.13 Acre Clearing & Grubbing 1.00 Lump Sum Construction Survey 66.00 Square Yard Drives, P.c.c. 500.00 Linear Foot Electrical Curcuits 575.00 Square Yard Engineering Fabric 555.00 Cubic Yard Excavation Class 10 130.00 Cubic Yard Excavation Class 20 8.00 Each Handhole 6.00 Each Intakes & Manholes/utility Access 94.00 Cubic Yard Modified Subbase 0.18 Acre Mulching 418.00 Square Yard Pavement, P.c.c. 1,710.00 Linear Foot Pile, Steel H, 10 in. 191.20 Linear Foot Rail, Concrete Barrier 341.10 Linear Foot Rail, Metal 64.00 Pound Reinforcing Steel 63,538.00 Pound Reinforcing Steel, Epoxy Coated 677.00 Square Yard Removal of Pvmnt/drives/sdwk 375.00 Ton Revetment 0.18 Acre Seeding & Fertilizing 159.00 Linear Foot Sewer, Storm 0.39 Station Shoulder Finishing 38.00 Square Yard Sidewalk, P.c.c. 232.00 Linear Foot Silt Fence 267.00 Cubic Yard Structural Concrete 263.00 Linear Foot Subdrain, Longitudinal 50.00 Cubic Yard Topsoil, Strip/salvage/spread 206.00 Linear Foot Water Main |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |