Similar Projects
Chewy Distribution Warehouse
New Construction - 1,000,000 SF
Conception
$35,000,000 est. value
Archbald, PA 18403

Pennsylvania Avenue Warehouse
New Construction - 976,300 SF
Conception
$10,000,000 CJ est. value
Morrisville, PA 19067

Thunderwash Commercial
Addition - 12,000 SF
Design
$385,000 est. value
Elverson, PA 19520

Airport Business Complex
New Construction - 98,410 SF
Design
Essington, PA 19029

Renovation of the Maintenance Barn at Harrison Hills Park
Renovation
Bidding
Natrona Heights, PA 15065

Storage Sheds
New Construction - 14 SF
Bidding
Less than $35,000 est. value
Philadelphia, PA

Life Storage
Renovation - 126,000 SF
Sub-Bidding
York, PA 17402

Equipment Storage Facility Project, Cowanesque Lake
New Construction
Post-Bid
Lawrenceville, PA

Salt Shed
Post-Bid
Clearfield, PA 16830

Capitol Preservation Committee New Storage Facility
New Construction
Results
Harrisburg, PA 17110

Construction of a New Dry Warehouse at the Philaport Distribution Center
New Construction
Results
$30,000,000 est. value
Philadelphia, PA

Blue Springs Egg Farm
New Construction - 432,000 SF
Construction
$140,000,000 est. value
Mercersburg, PA 17236

Hospital Storage Room
Renovation - 1,600 SF
Construction
$328,000 est. value
Pittsburgh, PA 15212

Okna Warehouse
New Construction - 111,230 SF
Pending Verification
$10,000,000 CJ est. value
Bristol, PA 19007

Children's Hospital of Philadelphia - Storage and Distribution Center
Renovation - 175,000 SF
Pending Verification
$10,000,000 CJ est. value
Philadelphia, PA 19139

Last Updated 11/03/2021 08:33 AM
Project Title

E-Waste Facility Relocation

Physical Address View project details and contacts
City, State (County) Lebanon, PA   (Lebanon County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Bid is for the construction of a 6,000 SF post frame building to contain the GLRA’s electronic waste collection operations. The Project consists of the construction of the warehouse, associated land development features, stormwater management, utility connections, and site stabilization. The Project is located in North Annville Township, Lebanon County, Pennsylvania, approximately 3 miles northwest of the City of Lebanon, PA.

Details

Warehouse/Storage, 6,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents