Similar Projects
Mondovi - Eau Claire, USH 10 to STH 85
Infrastructure
Bidding

Polymer Overlay of Three Bridge Decks
Infrastructure
Bidding
Berlin, WI

Bremer Ridge Road Hot Mix Blacktop
Post-Bid
WI 54612

Single Chip Sealing
Post-Bid
Fountain City, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Crack Sealing and Chip Sealing of Bridge Creek Road
Infrastructure
Post-Bid
Mondovi, WI

Reconstruction/Resurfacing Bids
Renovation
Results
Alma, WI 54610

Baertsch Court Road Reconstruction / Resurfacing
Results
Fountain City, WI

Complete Pulverize and Re-Pave of 3.39 Miles of Road
Results
$706,463 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Trempealeau - Fountain City, Tremp River E. Channel Bridge
Results
Fountain City, Trempealeau, WI

Durand - Mondovi, Holmes Creek Bridge, B-06-0387
New Construction, Infrastructure
Results
WI

Mondovi - Eau Claire, USH 10 to STH 85
Infrastructure
Results

Modena, Hanson Bluff Road - Lee Valley Creek Bridge B-06-0184
Infrastructure
Results
Modena, WI

Last Updated 02/14/2022 02:29 AM
Project Title

Alma - Mondovi, CTH F to STH 88; Alma - Mondovi, CTH F to STH 88

Physical Address View project details and contacts
City, State (County) WI   (Buffalo County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HMA Pavement, Asphaltic Surface, Beam Guard, and Pavement Marking, Borrow, 4,058 CY; Backfill Granular, 1,600 CY; Base Aggregate Dense, 7,667 Ton; Construction Staking, 112,382 LF; Construction Staking, 4 Each; Construction Staking, 2 LS; Culvert Pipe, 24 LF 24”, 24 LF 30“, 146 LF 24“, 54 LF 30”; Beam Guard, 9,863 LF; Beam Guard Energy Absorbing Terminals, 24 Each; Asphaltic Surface, 980 Ton; HMA Pavement, 45,950 Ton; Removing Asphaltic Surface Milling, 211,041 SY; Tack Coat, 35,660 Gals; Marking Line Grooved Wet Ref Epoxy 4-Inch, 147,300 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents