Similar Projects
PCC Patching
Infrastructure
Results

HMA Resurfacing With Milling - U.S. 18
Infrastructure
Results
IA

HMA Resurfacing - R14, P66, B46
Infrastructure
Results
IA

Granular Surfacing of Roadway
Infrastructure
Results

2022 Street Improvements
Infrastructure
Post-Bid
$850,000 est. value
Algona, IA

Drainage District 60 Sub 1 Tile Improvements (REBID)
Infrastructure
Results
$441,500 CJ est. value
Swea City, IA 50590

Scooters Algona, IA Rebid
Demolition, New Construction, Infrastructure
Post-Bid
$750,000 CJ est. value
Algona, IA 50511

Shane and Nichole Taffe - Algona Apartment
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Algona, IA 50511

Microsurfacing
Infrastructure
Results
$2,933,352 CJ est. value
Burt, IA 50522

Microsurfacing
Infrastructure
Results
$2,933,352 CJ est. value
Burt, IA 50522

HMA Resurfacing
Infrastructure
Results
$3,404,315 CJ est. value
Bancroft, IA 50517

HMA Resurfacing
Infrastructure
Results
$3,404,315 CJ est. value
Bancroft, IA 50517

Extend Runway 12/30 Phase 1 Grading and Drainage
Infrastructure
Results
$400,000 CJ est. value
Algona, IA 50511

Extend Runway 12/30 Phase 1 Grading and Drainage
Infrastructure
Results
$400,000 CJ est. value
Algona, IA 50511

Extend Runway 12/30 Phase 1 Grading and Drainage
Infrastructure
Results
$400,000 CJ est. value
Algona, IA 50511

Last Updated 05/22/2023 10:31 AM
Project Title

Airport - City Of Algona

Physical Address View project details and contacts
City, State (County) Algona, IA 50511   (Kossuth County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $560,332 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include : Reconstruct Runway. As of July 7, 2020, the project is in early planning. Information regarding an architect and general contractor has not yet been disclosed. A timeline for construction has not been established at this point *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. As of May 22, 2023, no new information available

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents