Similar Projects
TxCDBG Street Rehabilitation 2017-2018
Post-Bid
Italy, TX 76651

FSMS Drive Connection/Expansion Project
Post-Bid
Midlothian, TX 76065

Southern Region Disaster Recovery Support BPA
Results

2019-2020 Annual Asphalt Rehabilitation Program Project
Term Contract
Results
$3,600,000 est. value
Midlothian, TX 76065

2020 Roadway Rehabilitations
Post-Bid
TX 76084

Prairie Ridge Phase 2B - Paving
Results
TX

Austin Boulevard North, Paving Drainage and 20" Waterline Improvements
Post-Bid
Red Oak, TX 75154

Cumberland Road Reconstruction
Results
$1,600,000 est. value
Waxahachie, TX 75165

Kaufman Street Reconstruction Phase I
Results
$1,100,000 est. value
Waxahachie, TX

Modification of Roadways at JB3 Pump Station
Results
Ennis, TX 75119

Flexible Pavement Structure Repair
Results
Less than $1,775,940 est. value
TX

Autumn Run/FM 663 Deceleration Lane/Right Turn Lane Project
Results
Less than $850,000 est. value
Midlothian, TX 76065

Cleaning and Sealing Joints and or Cracks
Results
Less than $156,946 est. value
TX

Ennis Downtown Master Plan Implementation - Knox Street
Results
Ennis, TX 75119

Northgate Drive Pavement Replacement
Results
Waxahachie, TX 75165

Last Updated 01/07/2020 12:52 PM
Project Title

East University Reconstruction Phase 1, West Marvin Avenue to Sycamore Street

Physical Address View project details and contacts
City, State (County) Waxahachie, TX   (Ellis County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of reconstructing East University Avenue from an existing asphalt roadway to a concrete section consisting of 7” of reinforced concrete with 6” of flexible base subgrade. The project also includes reconstructing Martha Street and Ross Street with an asphalt roadway consisting of 6” of HMAC with 6” of flexible base subgrade. Also included is the installation of approximately 2,000 LF of 18”-36” reinforced concrete pipe, 2,300 LF of 8” water line, 2,350 LF of 6”-15” sanitary sewer line, and 2,400 SY of ADA compliant sidewalks with curb ramps. The project also includes driveway repairs, concrete steps, street lights and various landscaping and irrigation restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents