Similar Projects
On-Call Duct Bank
Bidding
$10,000,000 est. value
Boston, MA

Boiler Replacement, High Street Veterans 200-1
Bidding
$275,565 est. value
Brookline, MA 02445

Fens Gatehouse Repurposing - Sub-Bids
Sub-Bidding
$1,155,996 est. value
Boston, MA

Demolition of Existing Generator, Gas Piping, and HVAC Equipment
Sub-Bidding
Less than $185,000 est. value
Bellingham, MA

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

HVAC Improvements at Braintree Town Hall
Post-Bid
Less than $120,000 est. value
Braintree, MA 02184

Pool HVAC Project
Results
$300,000 est. value
Westwood, MA 02090

Bolivar Aquatic Complex - Filed Sub Bid
Results
Less than $4,800,000 est. value
Canton, MA

Emergency Smoke Control Tunnel Fans
Term Contract
Bidding
Boston, MA

HVAC Maintenance and Repair
Post-Bid
Less than $90,000 est. value
Wrentham, MA 02093

Bathroom Mechanical Exhaust Fan Installation - General Bids
Results
Less than $215,676 est. value
Brookline, MA 02446

Demolition of Existing Generator, Gas Piping, and HVAC Equipment
Bidding
Less than $185,000 est. value
Bellingham, MA

Preventative Maintenance Inspections of Various HVAC Systems
Post-Bid
Less than $35,000 est. value
Braintree, MA

Install Air Source Heat Pumps at the Community Center
Results
$48,000 est. value
Sharon, MA 02067

Air-Conditioning (HVAC) Equipment and Systems
Bidding
Boston, MA

Last Updated 12/19/2019 11:22 AM
Project Title

Replace Bathroom Fans, Clean Bathroom Exhaust Ducts, Tobin Towers 667-4

Physical Address View project details and contacts
City, State (County) Quincy, MA 02170   (Norfolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $142,065
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The Project consists of: Demolition and disposal of existing toilet exhaust fans and discharge wall hoods. Installation of new toilet exhaust fans and discharge wall hoods. Electrically disconnect and reconnect HVAC equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents