Similar Projects
Pedestrian and Bicycle Improvements at Various Locations
Bidding
Less than $1,914,900 est. value

Pedestrian and Bicycle Improvements at Various Locations
Bidding
Less than $1,914,917 est. value

Streetscape Walk Surfaces
Post-Bid
Less than $30,000 est. value
Beverly, MA

Common Street Parking Lot
Post-Bid
Lawrence, MA

Behrakis Student Center Accessibility Upgrade for Northern Essex Community College
Results
Less than $534,000 est. value
Haverhill, MA

192 Merrimack Street Parking Structure
Results
Less than $1,250,000 est. value
Haverhill, MA

Citywide Sidewalk Repairs and Installations
Bidding
Less than $600,000 est. value
Lawrence, MA

Various Roads and Sidewalks Patching
Post-Bid
Ipswich, MA

Rowley Town Hall Annex - Ramp Replacement
Results
Less than $60,000 est. value
Rowley, MA

Lawrence Parking Lot Repairs
Bidding
Less than $750,000 est. value
Lawrence, MA

Golf Cart Path Improvement
Post-Bid
Less than $500,000 est. value
Salem, MA

Walk Surfaces, Driveways and Wheelchair Ramps
Results
Less than $864,850 est. value
Beverly, MA

Asphalt Walkway Installation
Bidding
Less than $16,000 est. value
Topsfield, MA

Arlington Street Parking Lot Project
Post-Bid
Lawrence, MA 01840

Granite Curbing
Results
Less than $47,004 est. value
Beverly, MA

Last Updated 03/13/2019 03:58 AM
Project Title

Construction of Phase 2 of the Canal Street Rail Trail Shared use Path from Canal to Roslyn Streets

Physical Address View project details and contacts
City, State (County) Salem, MA   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,685,212
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Construction of Phase 2 of the Canal Street Rail Trail Shared Use Path from Canal to Roslyn Streets. "800.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.172" "1650.000","Ft","96 Inch Chain Link Fence (Pipe Top Rail) w/Barb (Line Post Option)","647.096" "30.000","Ft","96 Inch Chain Link Gate With Gate Posts And Barbed Wire","651.096" "120.000","Ft","Wrought Iron Fence","655.3" "2330.000","Ft","Temporary Fence","657." "50.000","Ft","Chain Link Fence Removed And Reset","666." "1830.000","Ft","Chain Link Fence Removed And Discarded","666.1" "1.000","Ea","Chain Link Fence Gate w/Gate Posts Removed & Reset","668." "1.000","Ls","Remove & Dispose Utility Pole & Wire","673.2" "1000.000","Ft","Sedimentation Fence","697." "15.000","Ea","Silt Sack","697.1" "4719.000","Sy","Geotextile Fabric For Subsurface Drainage","698.2" "70.000","Sy","Cement Concrete Sidewalk","701." "60.000","Sy","Cement Concrete Patio","701.3" "6.000","Ea","Park Bench","707.1" "2.000","Ea","Flexible Bollard","707.81" "5.000","Ea","Steel Bollard","707.82" "25.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "620.000","Cy","Loam Borrow","751." "1.000","Ls","Non-Tidal Wetland Mitigation Area","755.3" "85.000","Hr","Professional Wetland Specialist","755.9" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "6050.000","Sy","Seeding","765." "4840.000","Ft","Sediment Control Barrier","767.121" "630.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "3.000","Ea","Maple - Red - 'October Glory' 2-2.5 Inch Caliper","776.543" "17.000","Ea","Oak - Pin 2-2.5 Inch Caliper","777.138" "15.000","Ea","Birch - Paper 1.5-2 Inch Caliper","778.121" "14.000","Ea","Shad Tree - Allegheny Clump 4-5 Feet","783.037" "10.000","Ea","Tulip Tree 2.5-3 Inch Caliper","783.442" "4.000","Ea","Juniper","786.333" "32.000","Ea","Bayberry Shrub - Northern 2-3 Feet","789.333" "45.000","Ea","Red Twig Dogwood","790.648" "21.000","Ea","Elderberry 2-3 Feet","791.033" "26.000","Ea","Sumac Shrub - Fragrant 15-18 Inch","794.321" "37.000","Ea","Winterberry - Female 24-30 Inch","795.157" "50.000","Ea","Area Lighting Under 10' Tall","823.211" "80.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "30.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "814.000","Hr","Roadway Flagger","850.41" "160.000","Sf","Safety Signing For Traffic Management","852." "10.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "2000.000","Ft","6 Inch Reflectorized Yellow Line (Thermoplastic)","867.106" "30.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete","901." "50.000","Cy","4000 Psi, 1.5 Inch, 565 Cement Concrete For Post Foundation","901.3" "2640.000","Lb","Steel Reinforcement For Structures","910." "510.000","Ton","Riprap","983.1" "10.000","Ton","Modified Rockfill","986." "1.000","Ls","South River Conduit Connection And Repair","998.1" "1.000","Ls","Track Signal, Electrical, And Communications Work","998.7"
Details
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents