Similar Projects
Landfill Disposal Facility Services
Infrastructure
Bidding
VA

Livingston Landfill Phase II Cells IIA and IIB
Alteration
Bidding
Spotsylvania, Spotsylvania Courthouse, VA 22551

Landfill Cap Repairs and Drainage/Berm Improvements
Post-Bid
Charlottesville, VA

Landfill Leachate Collection Layer-Material Hauling Contract
Term Contract
Post-Bid
VA

Accomack County Northern Landfill Cell Closure Project
Results
New Church, VA

Closure Capping - Hylton Site Sanitary Landfill
Results
Bedford, VA 24523

Landfill Services
Infrastructure
Bidding

H999--Semiannual Landfill Groundwater Monitoring Services
Post-Bid
Salem, VA 24153

I66 and I95 Upgrade Landfill Gas Monitoring
Results
VA

H999--Quarterly Landfill Gas Monitoring Services
Post-Bid
Salem, VA 24153

Solid Waste Management Facility Cell R2 Bottom Liner System
Results
Leesburg, VA 20175

Disposal of MSW Smith Gap Landfill
Post-Bid
Roanoke, VA 24153

Phase III Cell A Liner System
Results
Manassas, VA 20112

LFG and Dewatering System Improvement Project
Infrastructure
Post-Bid
Bristol, VA 24201

Design and Construction Services for the Regional Landfill Operations Area Improvements
New Construction - 15,169 SF
Results
Chesapeake, Suffolk, VA 23434

Last Updated 02/08/2022 12:01 PM
Project Title

Construction of Sequence V Cap and Cell 1A Cap Project for the Solid Waste Management Facility

Physical Address View project details and contacts
City, State (County) Leesburg, VA 20175   (Loudoun County)
Category(s) Environmental
Sub-Category(s) Landfill
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project site is at the LCSWMF, located at 21101 Evergreen Mills Road, Leesburg, Virginia 20175. The work consists of heavy earthwork, geosynthetics installation, and pipe work tasks. The geosynthetics work consists of procuring, delivering, unloading, deploying, and installing (welding, tying, seaming), various geosynthetic materials, and performing quality control, testing, and other associated work. The Contractor shall provide all equipment, materials, and labor needed to construct multi-layered landfill cap systems and leachate force main piping and fittings. The Contractor shall also be responsible for all quality control, testing, and surveying to ensure the project.

Details

Division 02 - Existing Conditions, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents