Similar Projects
Rice University Student Center
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Houston, TX 77005

CTE Center - Phase 1 (Ag Science Center to House Animals)
New Construction
Conception
$8,205,000 est. value
College Station, TX

Blinn College Rellis Student Building - Phase 2
New Construction - 80,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Bryan, TX 77807

Satellite Utility Plant (SUP3) Expansion
Addition
Design
$20,930,520 est. value
College Station, TX 77840

Kingwood Campus - Health Professions Center
New Construction - 49,000 SF
Post-Bid
Kingwood, TX 77339

Ron Mafrige Field House Renovation
Renovation - 27,000 SF
Post-Bid
$11,000,000 est. value
Huntsville, TX 77340

UH Hilton College Renovation and Expansion
Renovation
Results
$30,400,000 est. value
Houston, TX

CMB - Studio 6A Renovation
Renovation
Results
Less than $301,271 est. value
Austin, TX 78722

Renovate Smith Research Building Construction Manager at Risk
Renovation
Construction
Houston, TX 77054

Southern Methodist University Perkins Chapel Phase II
New Construction - 7,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dallas, TX 75205

Borderlands Research Institute
New Construction
Pending Verification
$22,447,000 est. value
Alpine, TX 79830

Cherry Engineering Building Renovation
Renovation
Pending Verification
$2,500,000 est. value
Beaumont, TX 77705

Trinity University Campus
New Construction, Renovation, Addition
Conception
$50,000,000 est. value
San Antonio, TX 78212

Gibbs Ranch Equestrian Facility & Agriculture Labs Phase 2 Construction
New Construction
Design
$5,000,000 est. value
Houston, TX

McKinney Campus Welcome Center
Post-Bid
$12,500,000 est. value
McKinney, TX 75071

Reported 02/03/2022 12:00 AM
Project Title

Job Order Contracting Services for Interior Renovations and General Construction Services

Physical Address View project details and contacts
City, State (County) Tyler, TX   (Smith County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal: 21.1% The University typically selects projects for issuance to the JOC Program with an estimated construction cost in the range from $50,000 to $250,000. The typical cost of a single project is approximately $75,000.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents