Similar Projects
Hogan Park Phase I Construction - City of Midland
Infrastructure
Conception
$7,000,000 CJ est. value
Midland, TX 79705

Scharbauer Sports Complex - Baseball - Sound System - City of Midland
Infrastructure
Conception
$350,000 CJ est. value
Midland, TX 79706

Murphy Express #8612 / Odessa
New Construction, Infrastructure - 2,800 SF
Design
$2,500,000 CJ est. value
Odessa, TX 79761

Attoyac Bayou Site 21 Remedial Repairs In Nacogdoches County, Texas
Term Contract
Design
$100,000 to $250,000 est. value

Midland County Law Enforcement Complex
New Construction, Infrastructure
Bidding
$187,000,000 CJ est. value
Midland, TX 79701

Construction of Ector County Juvenile Justice Center
New Construction, Infrastructure - 62,588 SF
Bidding
$26,000,000 CJ est. value
Odessa, TX 79766

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

PU19-01 Park Avenue Heights 2 Utility Project
Results
Midland, TX

Grading and Drainage at Washington Park
Infrastructure
Results
Midland, TX 79701

Midland Store / Hops, Scotch and Vinery
New Construction, Infrastructure - 3,607 SF
Construction
$750,000 CJ est. value
Midland, TX 79701

Midland Store / Hops, Scotch and Vinery
New Construction, Infrastructure - 3,607 SF
Construction
$750,000 CJ est. value
Midland, TX 79701

Lilly Heights Garden Office Lot 10
New Construction, Infrastructure - 3,609 SF
Pending Verification
$902,250 CJ est. value
Midland, TX 79707

Lilly Heights Garden Office Lot 7
New Construction, Infrastructure - 4,854 SF
Pending Verification
$1,213,500 CJ est. value
Midland, TX 79707

Dunagan Park Lighting - City of Midland
Infrastructure
Conception
$600,000 CJ est. value
Midland, TX 79701

Last Updated 01/30/2023 02:31 AM
Project Title

Plant Farm Ponds Rehabilitation

Physical Address View project details and contacts
City, State (County) Midland, TX 79701   (Midland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,276,092 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The Project includes constructing the Work broadly described below, in accordance with the Contract Documents, with all related appurtenances. Work shown on the Drawings, or indicated in the Specifications, or indicated elsewhere in the Contract Documents is part of the Work, regardless of whether indicated below. The Work includes, but is not limited to, the following: 1. All labor, materials, equipment, and necessary incidentals required for the removal and replacement the pond liners at Farm Pond A and Farm Pond B. Bids are requested for the following Contract: Plant Farm Ponds Rehabilitation Project EJCDC(R) C-111, Advertisement for Bids for Construction Contract. Copyright(C) 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. 00 11 13 - Page 2 of 2 For questions or information concerning this project, contact Ms. Lisa Singer, HDR, 4401 West Gate Blvd., Suite 400, Austin, TX 78745, lisa.singer@hdrinc.com; CC Mr. Sherif Mabrouk, sherif.mabrouk@hdrinc.com. Each bid must be submitted in a sealed envelope bearing on the outside the name of the bidder, their address, and the name of the project for which the bid is submitted. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents The deadline to ask questions is 1/05/2023 5:00 PM CST . The Work is located at: 1. The City of Midland's Farm Ponds along S County Road 1150, between Farm to Market 307 and TX-158. All labor, materials, equipment, and necessary incidentals required for: the draining, sludge removal and hauling and removal and replacement the pond liners at Farm Pond A and Farm Pond B. Work also includes all labor, materials, equipment, and necessary incidentals required for grading and subgrade preparation of the ponds; the removal and replacement of the leak detection well heads, and leak detection piping; and backfill replacement based on the condition of the existing system

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents