Similar Projects
Home2Suites and Hilton Garden Inn / Edwardsville
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Edwardsville, IL 62025

Existing Building Classroom Addition
Addition
Design
Highland, IL

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Water Main Replacement
Infrastructure
Post-Bid
Bethalto, IL 62010

East End Detention
Infrastructure
Post-Bid
Wood River, IL

Road Improvements
Results
Troy, IL

Maintain and Service all ITS Equipment at Various Locations throughout District 8
Infrastructure
Results

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Starbucks / Collinsville
New Construction, Infrastructure - 2,226 SF
Construction
$400,000 CJ est. value
Collinsville, IL 62234

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

Chick-fil-A / Glen Carbon
New Construction, Infrastructure - 5,000 SF
Pending Verification
$1,000,000 CJ est. value
Glen Carbon, IL 62034

St. Louis Road Storm Sewer Project
Infrastructure
Bidding
$940,000 CJ est. value
Collinsville, IL 62234

Country Lane Resurfacing and Culvert Replacement
Infrastructure
Post-Bid
Troy, IL 62294

Alton Williams Street Brick Street Replacement
Infrastructure
Results
Alton, IL 62002

Last Updated 12/01/2022 02:32 AM
Project Title

Granite City School District 9 New Softball Field Packages 01A, 04A, 06A, 07I, 11F, 11I, 12G, 26A, 26B, 31A, 32A, 32B, 32G, 32H, 32L and 33A

Physical Address View project details and contacts
City, State (County) Granite City, IL 62040   (Madison County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Maintenance, Park/Playground, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Sub-Bids Received, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Granite City School District #9 New Softball Field Work Packages WP# Description 01A Material Testing 04A Masonry 06A Rough Carpentry 07I Metal Roofing, Flashing & Sheet Metal 11F Scoreboards 11I Athletic Equipment - Field 12G Aluminum Bleachers 26A Electrical 26B Athletic Field Lighting (Alternate #4) 31A Earthwork 32A Asphalt Paving (Alternate #1) 32B Site Concrete 32G Athletic Surfaces 32H Fencing & Gates (Alternate #3) 32L Landscaping 33A Site Utilities All bidders are required to prequalify to the requirements described in Document 002113 -Instructions to Bidders. Bidders will be required to provide Bid security in the form of a Bid Bond of a sum no less than 5 percent of the Bid Amount. If awarded the contract, will furnish a satisfactory Performance and Payment Bond; execute the Contract; and proceed with the work. Upon failure to do so, he shall forfeit the deposit or amount of the Bid Bond as liquidated damages, and no mistakes or errors on the part of the Bidder shall excuse the Bidder or entitle him to a return of the deposit or Bid Bond. Submit your offer on the Bid Form provided. Bidders may supplement this form as appropriate. Your offer will be required to be submitted under a condition of irrevocability for a period of 30 days after submission. The Owner and Construction Manager reserves the right to accept or reject any or all offers. This project has a Project Labor Agreement with the Trade Unions. The Statutes of the State of Illinois require that not less than the prevailing rate per diem, legal holiday, and overtime wages in the locality where the work is to be performed, be paid to all laborers, workmen, and mechanics employed in the execution of the Contract. All other Statutes of the State of Illinois covering employment shall apply to any contract awarded. Bidders must be in compliance with the rules and regulations of the Fair Employment Practices Commission. Participation by Minority and Female Business Enterprises is encouraged. S. M. Wilson & Co. is an Equal Opportunity Employer. Please meet at the baseball field parking lot located on the north side of the site on Fehling Rd.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents