Similar Projects
Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$2,895,000 CJ est. value
Chadds Ford, PA 19317

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Clifton Heights Middle School
New Construction
Design
$65,000,000 est. value
Clifton Heights, PA 19018

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,440,000 CJ est. value
Upper Darby, PA 19082

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sellers Avenue O/AMTRAK
Demolition, New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Upper Darby, PA 19082

New Domestic Water Service for the Courthouse Building
Infrastructure
Post-Bid
Media, PA 19063

Haverford High School Project 2 - General Construction
New Construction, Renovation, Addition - 19,850 SF
Post-Bid
$8,842,000 est. value
Havertown, PA 19083

Glenwood Elementary School Classroom Renovations
Renovation - 1,310 SF
Results
Media, PA 19063

District Administration Office & Transportation Facility Renovation - General Construction
Renovation
Results
$7,100,000 est. value
Drexel Hill, PA

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Vision Academy Charter School
Renovation - 198,942 SF
Construction
East Lansdowne, PA 19050

Ridley Chipotle & Urgent Care
Build-Out - 6,850 SF
Pending Verification
Holmes, PA 19043

Estates at Coventry Woods Phase 2A
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Springfield, PA 19064

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Last Updated 02/09/2023 02:09 PM
Project Title

Bid Package 2 - Interior Renovations and Upgrades at DES, HES, NEES, VFES, TEMS, VFMS & CHS

Physical Address View project details and contacts
City, State (County) Wayne, PA 19087   (Delaware County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Food/Beverage Service, Middle/Senior High School, Site Development, Theaters/Auditoriums, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate - 01/16/23
Owner View project details and contacts
Architect View project details and contacts
Description

The Tredyffrin/Easttown School District requests sealed bids for Bid Package 2, Interior Renovations and Upgrades at Devon Elementary School (DES), Hillside Elementary School (HES), New Eagle Elementary School (NEES), Valley Forge Elementary School (VFES), Tredyffrin/Easttown Middle School (TEMS), Valley Forge Middle School (VFMS), and Conestoga High School (CHS) The project consists of miscellaneous general construction, electrical, mechanical, and plumbing renovations, and upgrades to Devon Elementary School (DES), Hillside Elementary School (HES), New Eagle Elementary School (NEES), Valley Forge Elementary School (VFES), Tredyffrin/Easttown Middle School (TEMS), Valley Forge Middle School (VFMS), and Conestoga High School (CHS). Work includes casework replacement and upgrades at DES and TEMS, construction of interior vestibules at NEES, VFES, and TEMS, floor finish replacements and upgrades at VFES, VFMS, and CHS. Storefront and door replacements at DES and HES. Window replacements at CHS. Restroom Upgrades at VFES. Mop receptor replacements at VFES and TEMS. Domestic water piping replacements at TEMS and CHS. Emergency Panel Upgrades at VFES and TEMS, Emergency Lighting Upgrades at DES. Auditorium Lighting replacement at TEMS, VFMS, and CHS. Cafeteria Lighting replacement at CHS. Wiremold replacements at VFES loctaions- Devon Elementary School - 400 S Fairfield Rd, Devon, PA 19333 Hillside Elementary School - 507 Howellville Rd, Berwyn, PA 19312 New Eagle Elementary School - 507 Pugh Rd, Wayne, PA 19087 Tredyffrin/Easttown Middle School - 801 Conestoga Rd Berwyn, PA 19312 Conestoga High School - 200 Irish Road Berwyn, PA 19312 Valley Forge Middle School - 105 Walker Rd Wayne, PA 19087 Valley Forge Elementary School - 99 Walker Rd, Wayne, PA 19087 Provide and install new split system air conditioning units and all associated hangers, supports, refrigerant piping, insulations, controls and wiring. . Provide and install new cabinet unit heater all associated ductwork, hot water supply and return piping, controls and wiring. 6. Provide and install fin tube radiator and all associated supports, hot water supply and return piping, fittings, valves, controls and wiring. . Provide all new piping, ductwork, & equipment insulation. . Provide complete system balancing at the completion of the project per contract specifications. . Provide all associated control equipment required unless otherwise noted. . Providing all necessary permits, approvals, fees, etc. . Provide instructions to the owner as outlined in these Specifications. . Provide all cutting and patching as required to perform the work of this contract. . Provide all necessary rigging as required to perform the work of this contract. . Provide manufacturer startup for all systems specified as outlined in these Specifications. . Provide removal of trash and general clean-up. . Provide as-built drawings. . Provide operation and maintenance manuals. . Employ the services of the local Underwriters' Inspection Agency and pay for all associated fees. . Completion Date: All HVAC work shall be completed on the date of substantial completion for the project as set in the Division 1 specifications. The Mechanical Contractor will: a. Furnish and set all motors for mechanical equipment. b. Furnish all motor starters, VFDs, starter/disconnects, HVAC unit mounted disconnects, contactors, pushbuttons and switches for local and remote control of all HVAC equipment and turn over to the Electrical Contractor for installation. c. Provide pre-wired control panels, including relays, switches, pilot lights, etc., all as shown and/or specified, complete with wiring to numbered terminal strips. d. Furnish and install duct and pipe-mounted control devices, such as freezestats, aquastats, flow switches, etc. e. Furnish wiring diagrams for the systems, in sufficient time to allow roughing-in of conduit in accordance with the proposed work schedule. f. Provide the 120-24V transformers for the VAVs to the EC for installation and wiring. MC shall provide all 24V wiring. g. For HVAC controls, the MC or their controls sub-contractor is responsible to provide all control wiring including 120V controls, 120V power to controls cabinets, 120V power and 120/24V control power transformers as required for a complete and fully functional system. EC will install the main power feeds to each piece of HVAC equipment only. h. Provide all data CAT6 cabling, as required, for the HVAC controls equipment and systems from the nearest IDF or MDF closet. MC shall hire the EC's low-voltage sub-contractor to perform this work for consistency. i. Receive duct detectors and air sampling tubes from the EC and install in the ductwork. MC shall provide and install all shut-down and system activation wiring from the smoke detectors to the respective units. construction can be completed on or before August 21, 2023

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating, Fixed Audience Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Electronic Digital Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents