Similar Projects
Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

Warren Covered Bridge Rehabilitation - Rebid
Infrastructure
Bidding
$1,000,000 CJ est. value
Warren, VT 05674

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

The Bridges Resort - Water Treatment System Improvements
New Construction, Infrastructure
Post-Bid
$425,000 CJ est. value
Warren, VT 05674

Site Work Services
Term Contract
Results
$60,000 est. value
Montpelier, VT

Valve Exercising at Public Community Drinking Water Systems
Term Contract
Results
$50,000 est. value

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Construction
$70,000 est. value
Waitsfield, VT 05673

Brook Street Water Line - City of Barre
Infrastructure
Conception
$240,000 CJ est. value
Barre, VT 05641

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Hill Street Water Line (Upper) - City of Barre
Infrastructure
Conception
$220,000 CJ est. value
Barre, VT 05641

Main Street Water Replacement
Infrastructure
Results
Montpelier, VT

Center Street / Vine Street / Bassett Street / Church Street - City of Barre
Infrastructure
Conception
$535,000 CJ est. value
Barre, VT 05641

Crosstown Road Water Line Repair
Infrastructure
Results
Berlin, VT 05602

Last Updated 10/05/2022 04:20 PM
Project Title

State Street Sewer and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Montpelier, VT 05602   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $675,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of approximately 500 LF of PVC sewer main, approximately 400 LF of PVC storm drain, precast manholes and catch basins, water service abandonment, water main extension, pavement restoration, and all other work necessary to complete the project. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. All questions shall be submitted in writing to the Engineer at swelch@dufresnegroup.com by 5:00 PM local time on September 29, 2022. This project is funded in part through the Vermont Clean Water State Revolving Fund. Consequently, the following provisions apply to this WORK (more detail for each of these provisions can be found in Instruction to Bidders): 1. Bid security in accordance with the Instructions to Bidders 2. Disadvantaged Business Enterprise (DBE) requirements 3. Performance BOND and Payment BOND each in the amount of 100% of the contract price 4. "AIS" (American Iron and Steel) Provisions of P.L. 113-76, Consolidated Appropriations Act 5. Federal Wages as determined under the Davis-Bacon Act 6. Prohibition of Certain Telecommunication and Video Surveillance Services or Equipment

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents