Similar Projects
Northpoint 90 Logistics Center
New Construction - 2,536,100 SF
Conception
Houston, TX 77049

Office Building & Warehouse
New Construction - 80,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Groesbeck, TX 76642

Jestex Warehouse
Addition - 4,200 SF
Design
$1,000,000 est. value
Houston, TX 77012

Eldorado Parkway Warehouse
New Construction - 2,850 SF
Design
$225,000 est. value
McKinney, TX 75070

New Maintenance, Operations and Warehouse Facility Project
New Construction - 149,185 SF
Post-Bid
Less than $15,300,000 est. value
Pasadena, TX 77501

Pre-Engineered Metal Storage Building
Post-Bid
Zapata, TX 78076

Steel Building
Results
$9,300 est. value
Irving, TX

Construction of a Pre-Engineered Metal Maintenance Building
Results
Less than $198,607 est. value
Bacliff, TX

HEB Distribution Center
Addition - 99,831 SF
Construction
$12,500,000 est. value
Houston, TX 77041

Buckingham Road Development
New Construction - 38,900 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Richardson, TX 75081

Amazon Sorting Center
Build-Out - 307,840 SF
Pending Verification
Kyle, TX 78640

District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

APEX Office & Warehouse
New Construction - 6,500 SF
Design
$400,000 est. value
Dallas, TX 75220

Service Center Storage Facility
Post-Bid
$100,000 est. value
Mesquite, TX 75149

Fire Training Building Expansion
Results
League City, TX 77573

Last Updated 04/23/2021 07:54 AM
Project Title

Renovation, Warehouse and Signal Shop, Pharr DHQ

Physical Address View project details and contacts
City, State (County) Pharr, TX 78577   (Hidalgo County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,941,380
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The District Warehouse requires electrical and safety be brought to current standards. Space within the Warehouse will include conference rooms, storage space, offices and restrooms. Various loading dock doors will be closed off (except for one). Lighting and Heating, Ventilation, and Air Conditioning (HVAC) will require updating to accommodate the needs of employees. Electrical and data connections will be coordinated to accommodate new furnishings (to be provided and installed by the State). The electrical gear located at the exterior East wall of Teleconference and Training Center shall be replaced with new switchgear to meet current standards. Electrical modifications will include items identified in the Pharr District Complex - Electrical Upgrades Programming Narrative dated July 3, 2018. 2. The Signal Radio Shop also requires electrical and safety to be brought to current standards. The space within the Signal Shop will include offices, a radio shop, IT Closet, Men’s and Women’s toilet rooms with showers, a break room, open workspace and a workbench. There is an existing shop bay and warehouse area that requires electrical and safety to be brought to current standards. All work consists of interior renovation of the building with exception of the addition of accessible ramps at building entrances. All existing utilities are of sufficient capacity to accomplish the proposed project. Master Water or Sewer Studies are not included in the scope. No site civil work is required. Fire Protection is not required. Hazardous material testing and abatement not required by Architect or Engineer. Hazardous materials will be removed from the facility prior to demolition.

Details

Warehouse/Storage, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents