Similar Projects
Mouth of the Columbia River Sand Island Pile Dikes Repair
Alteration
Design
$25,000,000 to $100,000,000 est. value

Thurston Drainage Improvements
Infrastructure
Bidding
$697,000 to $891,000 est. value
Bend, OR 97701

Tidegate Replacement and Wetland Habitat Restoration
Infrastructure
Bidding
$400,000 est. value
Coquille, OR

Fairview Creek Pipe Culvert Joint Repair
Infrastructure
Post-Bid
Gresham, OR

Windy Creek Bridge Replacement Reuben Road
New Construction, Infrastructure
Post-Bid
$2,100,000 est. value
Glendale, Roseburg, OR 97442

OR 214 - Johna Ln. - Fenne Ln. (Silverton) Sec. Silver Creek Falls Vidal Francis, Pm
Infrastructure
Results
$500,000 to $1,000,000 est. value
Silverton, OR

ADA Ramps - W Baseline Road
Alteration
Results
$300,000 to $400,000 est. value
OR

Cured-in-place Pipe Repair
Infrastructure
Bidding
$60,000 est. value
Four Corners, OR

OR42: Frenchie Creek Culvert Project
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
Bridge, OR 97458

US101: MP 348.45 NB Landslide Mitigation
Infrastructure
Results
OR

MP 198.16 Road Creek Culvert Repair Project
Infrastructure
Bidding
$40,000 est. value
Ontario, OR

Schoolhouse Street Improvements
Infrastructure
Post-Bid
Depoe Bay, OR 97341

North Williams Street Storm Improvements
Infrastructure
Results
Lebanon, OR 97355

Hillcrest Loop Culvert Replacement Project 2022
Infrastructure
Bidding
$1,304,000 est. value
Astoria, OR 97103

Neal Creek Phase 2 Habitat Enhancement Project
Infrastructure
Post-Bid
$250,000 to $500,000 est. value
Warm Springs, OR

Last Updated 06/24/2022 12:25 AM
Project Title

Tom Creek Culvert Replacement

Physical Address View project details and contacts
City, State (County) Tiller, OR   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and permits required to remove the undersized pipe arch and replace it with a larger stream simulation pipe arch on Tom Creek, which will involve the removal and disposal of the existing pipe arch; installation of a riprap and backfill; installation of new corrugated steel pipe arch, and seeding and leaving worksite as specified. All necessary expertise, labor, equipment, materials, incidentals, and permits required to remove the undersized pipe arch and replace it with a larger stream simulation pipe arch on Tom Creek. Bidder shall enter the Total Base Bid in this line item. Exhibit 1 Pricing Submittal shall be attached in the Bid Response and shall be used as the official tabulation document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Riprap.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents