Similar Projects
Well Drilling Services
Post-Bid
Sprague, CT 06330

WPCA Pump
Post-Bid
Plainfield, CT

John S. Roth Wellfield Improvements
Results
$1,700,000 est. value
Middletown, CT

4" and 6" Submersible Non-Clog Wastewater Pumps and Base Elbows
Results
Wallingford, CT

New Unused 3-Inch Diaphragm Pump
Post-Bid
Wallingford, CT

Chemical Improvements at the North Sleeping Giant Wellfield
Results
Hamden, CT

Primary Sludge Pump and Primary Settling Tank Mechanism Replacements
Post-Bid
Less than $350,000 est. value
Portland, CT

Preventative Maintenance, Inspection and Repairs to the Hartford and Berlin Pump Stations and Generators
Term Contract
Results
Hartford, CT 06106

KSB Model KRT K 100-251/164XG Submersible Pump
Post-Bid
New Canaan, CT

Recondition Effluent Pump 3 at Globe Hollow Water Treatment Plant
Results
$40,000 est. value
Manchester, CT 06040

Rehabilitation and Reconditioning of Fish Wells at Two State DEEP Hatcheries
Post-Bid
Kensington, CT

Pool Pump Replacement at Town Pool High Plains Community Center
Results
Less than $15,075 est. value
Orange, CT 06477

Grinder Units for Scum and Sludge Transfer Pumps
Results
Stamford, CT

Repair of Johnston 24PO-1 Stage Vertical Storm Water Pump 2 at Cummings Pump Station
Term Contract
Results
Stamford, CT

Well Testing and Drilling Services
Results
Less than $82,150 est. value
Mansfield Center, CT 06250

Last Updated 06/23/2021 04:19 PM
Project Title

WWW Hydraulic Turbine High Lift Pump and High Lift Pump 1 Repairs Project

Physical Address View project details and contacts
City, State (County) Mansfield, CT   (Tolland County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all labor, material, equipment, services, perform, complete and warranty all work required for the WWW Hydraulic Turbine Lift Pump and High Lift Pump #1 Repairs Project

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents