Similar Projects
STH 11 - STH 81 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Shullsburg, WI 53586

STH 11 - STH 81 Const / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Shullsburg, WI 53586

Proposed Street Reconstruction - North Iowa Street
Infrastructure
Design
$75,356 CJ est. value
Shullsburg, WI 53586

Proposed Street Reconstruction - North Iowa Street
Infrastructure
Design
$75,356 CJ est. value
Shullsburg, WI 53586

Resurfacing of Dublin Road
Infrastructure
Post-Bid
Darlington, WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Walnut Road and Redrock Road Intersection Reconstruction
Results
WI

Resurfacing Project on Rural Ridge Road South of CTH Q
Infrastructure
Post-Bid
$62,000 CJ est. value
Cuba City, WI 53807

2021 Infrastructure Improvements
Results
$1,800,000 est. value
Shullsburg, WI 53586

Resurfacing Project on Everson Road North of CTH G
Infrastructure
Post-Bid
$310,000 est. value
WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Woodford State Bank Addition
Addition, Renovation, Infrastructure - 6,300 SF
Post-Bid
$1,000,000 CJ est. value
South Wayne, WI 53587

Blackhawk Road Structure Replacement Project
Infrastructure
Results
Shullsburg, WI 53586

Centex Addition
Addition, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
South Wayne, WI 53587

Last Updated 08/25/2022 09:03 PM
Project Title

Lafayette County Chip-S Project

Physical Address View project details and contacts
City, State (County) Darlington, WI 53530   (Lafayette County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,400,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of 08/04/2022 No start and end date. For the following work: CTH W from Grant County Line to 1600 FT West of Mullen RD. (Approx. 8.6 miles) milling 1.5" of existing roadway as specified, and supplying and laying 3" mat ( approximately 20,000 Tons) of Hot Mix Asphalt, shouldering and pavement marking. A State of Wisconsin Type E-1 HMA design mix is specified. Each bid must be accompanied by a cashier's check, money order, or bidder's bond for an amount equal to not less than of the total bid, made payable to Lafayette County Highway Department, such guarantee to be forfeited should the successful bidder fail to enter the contract. The letting of the work described herein is subject to the provisions of Sections 59.52(29, 66.0901 and 66.0903 of the WI State Statutes. Funding for the project will be by Lafayette County and State of WI Local Programs. Notice is hereby given that a rate of wage scale will not be provided, but wages shall not be less than the wage rate scale established by local wage rates. Award of the Contract, if contract is awarded, will be to the lowest responsible bidder, but Lafayette County reserves the right to reject any or all bids and to split any portion of the bid so that such bids as will be most advantageous to Lafayette County. Further, Lafayette County reserves the right to waive or not to waive any informality in any bid. The County reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work as may be necessary by the County; and the same shall in no way affect or make void the Contractor; except that the appropriate additions or deductions from the Contract price shall be made. Proposals received after the time announced for the opening will not be considered. No bidder may withdraw his proposal after the time announced for the opening of the bid, before the award and execution of the Contract, unless the award is delayed for a period exceeding 60 days.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents