Similar Projects
Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Bethlehem Roadwork
Infrastructure
Design
$300,000 CJ est. value
Wheeling, WV 26003

Pedestrian/Bike Facilities - Pleasant St Streetscape
Infrastructure
Bidding
$1,479,143 CJ est. value
Morgantown, WV 26505

Const New/reloc Road - Northern Connector
Infrastructure
Bidding
$8,000,000 CJ est. value
Berkeley Springs, WV 25411

RFQ Construction Manager - Addition to West Virginia Health Right
Addition, Demolition, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Charleston, WV 25311

New Fire Station for the Ridgeley VFD - Ridgeley Volunteer Fire Department
New Construction, Infrastructure
Post-Bid
$875,000 CJ est. value
Ridgeley, WV 26753

Site Development - Facility Expansion Project
Results
Summit Point, WV

Site Development
Alteration
Results
WV

Meadow River Trail Russellville Bridge Replacement
Demolition, New Construction, Infrastructure
Construction
$981,245 CJ est. value
Fayetteville, WV 25840

New Ranson and Shepherdstown Elementary Schools
New Construction, Infrastructure - 136,000 SF
Pending Verification
$20,000,000 CJ est. value
Ranson, WV 25438

Nucor Sheet Mill / Leon
New Construction, Infrastructure
Pending Verification
$2,700,000,000 CJ est. value
Leon, WV 25123

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Property Redevelopment - 1601 Washington Street East
Infrastructure
Post-Bid
Charleston, WV 25311

I-70 Mining - Panels 20
Infrastructure
Results
WV

Pocahontas ADA Ramps + 2
Infrastructure
Design
$451,963 CJ est. value
Marlinton, WV 24954

Last Updated 12/08/2022 10:11 AM
Project Title

Mason County Public Service District - 2021 PSD Water Extensions

Physical Address View project details and contacts
City, State (County) Point Pleasant, WV 25550   (Mason County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Method of Bidding will be as follows: CONTRACT #1 -Route 35 (SR817), Flatfoot, Duncan Creek Water Line Enhancements and Extensions: Unit price contract to provide and install approximately 32,255 LF of 8, 4, and 2 waterlines; including 14 gate valves, 4 fire hydrants, 2,060 LF of horizontal directional drilling, 244 LF of highway crossings, 4 service reconnections, and other appurtenances to provide a complete operating system. Alternate deducts include the complete removal of the area of Flatfoot and Duncan Creek. The Owner reserves the right to waive any informalities or to reject any or all bids. Each Bidder must submit with his bid, security in the amount, form, and subject to the conditions provided for in the Information for Bidders. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Any Contractor submitting a Bid on this project hereby certifies, indicates, and acknowledges that he he has a license and meets all the qualifications required by the statutes of the state and subdivision in which the work is to be performed. Bidders must comply with Article 21-11-11 of the West Virginia Code by including their contractor's license number on any bid submission.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents