Similar Projects
Wilson Hall Roof Replacement
Alteration
Bidding
$325,000 to $390,000 est. value
Pendleton, SC 29670

Roofing Envelope Services
Post-Bid

Roofing MACC
Post-Bid

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roofing Contractors for TL Hanna Gymnasium, 600 and 800 Hallways
Results
Anderson, SC 29621

Pickens and Anderson Hall Roof Replacement
Post-Bid
$900,000 to $990,000 est. value
Pendleton, SC 29670

Re-Roof of the Clyde Stone Building
Results
Anderson, SC 29622

Selective Roof Replacement and Repairs for Powdersville Middle School
Post-Bid
SC 29611

Central Services Sectional Roof Replacement
Results
Easley, SC 29640

Roofing Repair and Maintenance
Post-Bid

PBHPH Gym Ceiling Netting and Installation
Alteration
Results
Anderson, SC 29621

Roofing and Waterproofing Professional Services
Term Contract, Alteration
Post-Bid
Anderson, SC

Anderson VR Center Reroofing
Alteration
Results
$550,000 to $650,000 est. value
Anderson, SC

Roof Coating and Repair for Transportation Building
Alteration
Post-Bid
Anderson, SC

Palmetto High School Selective Roof Replacement
Alteration
Results
Williamston, SC 29697

Reported 01/21/2022 12:00 AM
Project Title

Anderson Hall Canopy Roof Recovery

Physical Address View project details and contacts
City, State (County) Pendleton, SC 29670   (Anderson County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $25,000 to $50,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Roof recovery of the existing low sloped roof system for approximately 8 roofing squares. Scope of work includes roof recovery of the existing low sloped roof system for approximately 8 roofing squares as indicated on drawing sheets. Roof recovery includes preparation as required by the Roofing Manufacturer of the existing roof system to receive the installation of mechanically attached (not to penetrate through the existing roof deck) ¼” inch tapered roof insulation with a 1” inch start thickness at the roof edge, and installation of a fully adhered thermoplastic PVC / KEE roof assembly. All new sheet metal items associated with the installation of the new roof assembly are required. 2. Alternate No. 1: Scope of work includes roof recovery of the existing low sloped roof system for approximately 8 roofing squares as indicated on drawing sheets. Roof recovery includes preparation as required by the Roofing Manufacturer of the existing roof system to receive the installation of a fully adhered fleece-back thermoplastic PVC / KEE roof assembly. All new sheet metal items associated with the installation of the new roof assembly are required as shown on the drawing details. The existing gutter system will remain and be cleaned of all debris will all sheet metal laps properly sealed to be watertight. 3. Alternate No. 2: Scope of work includes Scope of work includes the bottom of the roof deck and all metal canopy framing will be painted. Preparation, priming and two coats of exterior industrial paint. Color will be determined by the Owner.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents