Similar Projects
Excavation Work for Gateway Preparatory Academy
Infrastructure
Design
$130,000 CJ est. value
Enoch, UT 84721

Brian Head Town Trail Phase 3 Project
Infrastructure
Design
$80,000 CJ est. value
Brian Head, UT 84719

Thunderbird Way Storm Drain / ADA Sidewalk Project
Infrastructure
Bidding
$1,675,000 CJ est. value
Cedar City, UT 84720

Frontier Homestead Museum Area Painting and Grounds Improvements
Infrastructure, Renovation
Bidding
$295,000 CJ est. value
Cedar City, UT 84721

Construction Of Old Irontown Property Owners Association Waterline Construction Project
New Construction, Alteration
Post-Bid
Cedar City, UT 84720

Storm Drain Improvements Project - Center Street Concrete Inlet and Outlet Structures 2022
Infrastructure
Post-Bid
$400,000 CJ est. value
Cedar City, UT 84720

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

DFCM Construction-Standard Low Bid-Old Iron Towns Site
Infrastructure
Results
$160,000 est. value
Cedar City, UT 84720

Toboggan Lane and Snowman Drive Waterline Project
Infrastructure
Design
Brian Head, UT 84719

CICWCD Test Well and Vandenberghe Well Projects
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Cedar City, UT 84720

Well Equipping Project
Infrastructure
Results
$499,410 CJ est. value
Cedar City, UT 84720

Canyon Sewer Line Capacity Project
Infrastructure
Design
$500,000 CJ est. value
Brian Head, UT 84719

Cedar City Rural Initiative (VA-22-00040092)
Demolition, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Cedar City, UT 84720

Southern Utah University (SUU) Valley Farm New Stock Building
New Construction, Infrastructure
Results
$725,225 CJ est. value
Cedar City, UT 84720

800 South Water Tank
Infrastructure
Post-Bid
$500,000 CJ est. value
Cedar City, UT 84720

Last Updated 01/24/2023 02:13 PM
Project Title

Cedar City Test Well - Martin's Flat

Physical Address View project details and contacts
City, State (County) Cedar City, UT 84720   (Iron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $357,825 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Cedar City is accepting separate sealed BIDS for the Cedar City Test Well - Martin's Flat Project according to specifications prepared by the City. The right is reserved by Cedar City to reject any and all Bids. SCOPE OF WORK The Contractor shall furnish all labor, materials, equipment, transportation apparatus, fuel, light and tools necessary for the entire completion of the project as outlined herein and shall construct in the best and most workmanlike manner the complete job and everything properly incidental thereto as shown on the plans, stated in the specifications, or reasonably implied therefrom, all in accordance with the Contract Documents, ready for occupancy and use in all respects. LOCATION The project is located in various locations near Cedar City, Utah Installation Location: Martin's Flat Target A in Cedar Canyon, east of Cedar City. The test well location is listed in Table B - Drill Target Coordinates and Depths in the "Groundwater Well Siting Study" prepared by Willowstick.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents