Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Bridge over Norfolk Southern
New Construction, Infrastructure
Conception
$5,013,000 CJ est. value
Hammond, IN 46324

Tailor Row
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Hammond, IN 46320

Subdivision - Goodwill Store
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Crown Point, IN 46307

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

2023 Project Rebid Courtyard and Parking Lot Drainage and Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Munster, IN 46321

Hawks Crossing Subdivision Phase 2
New Construction, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Hobart, IN 46342

3500 Block of Jewett Avenue Water Main Replacement and Street Improvement
Infrastructure
Post-Bid
Highland, IN 46322

2021 Water Improvements
Infrastructure
Post-Bid
New Chicago, IN

East Side Transmission Water Main
Infrastructure
Results
$1,105,394 est. value
Cedar Lake, IN

Utopia Subdivision Water Main Replacement
Infrastructure
Results
$2,816,383 est. value
Cedar Lake, IN

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

2022 CCMG Street Improvement Project
Infrastructure
Construction
$1,533,684 CJ est. value
Highland, IN 46322

St. John Commons
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Dyer, IN 46311

Rise and Shine Car Wash - Crown Point
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Crown Point, IN 46307

Last Updated 02/10/2023 02:05 AM
Project Title

Gary Sanitary District 27th and Chase Street Force Main Replacement, Phase 2 - Section 219

Physical Address View project details and contacts
City, State (County) Gary, IN 46404   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $3,175,630 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Feb 08, 2023 Contract Award Number: W912P623C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Grimmer Construction Inc Contractor Awarded Address: Highland, IN USA Base and All Options Value (Total Contract Value): $3175630.00 Under this Solicitation Notice, the United States Army Corps of Engineers - Chicago District issues Solicitation No. W912P622B0004 for bidding purposes. Therefore, provided hereunder is the relevant bid package for the construction project entitled, "Gary Sanitary District 27th & Chase Street Force Main Replacement, Phase 2 - Section 219, Gary, Lake County, Indiana (USACE Acquisition)." PROJECT INFORMATION: The project is within publicly-owned property from 25th Avenue to 18th Street. The current plan of the project includes the installation of 1,000-1,500 feet of 48-inch diameter force main adjacent to the deteriorating and undersized 42-inch diameter force main. The work includes installing approximately 1,429 linear feet of new 48-inch force main and incidental related work. The new force main will be installed by open-cut excavation. It will not connect to the existing 42-inch force main or the 48-inch Phase I force main. The connections will be made once the complete force main is replaced. CONTRACTING OFFICE: USACE Chicago District, 231 SOUTH LaSALLE STREET, SUITE 1500, Chicago, IL 60604 ACQUISITION INFORMATION: Competition for this acquisition is RESERVED EXCLUSIVELY for Small Business Concerns. The North American Industry System Classification Code is 237110, with a small business size standard in dollars of $39.5 Million. The magnitude of cost for construction is estimated between $1,000,000.00 and $5,000,000.00. The Solicitation (Invitation for Bids -"IFB") is downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Responses to this Solicitation (Invitation for Bids) are due by 2:00 p.m. (Central Time) on January 25, 2023. IN THE CASE OF A DISCREPANCY BETWEEN THE DATES PUBLISHED IN THIS NOTICE AND THOSE CALLED OUT IN THE IFB DOCUMENT, THE DATES IN THE IFB DOCUMENT OVERRIDES THOSE PUBLISHED HEREIN THIS NOTICE; THIS IS RELATIVE TO THE IFB ISSUANCE DATE AND THE DUE DATE FOR BIDS. IMPORTANT POLICY: Bidders are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Ericka Hillard at (312) 846-5378, or via email: ericka.d.hillard@usace.army.mil. ** Please include Solicitation Number W912P622B0004 on all correspondence. ** *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (20.9%), WBE (6.9%), SBE (100%)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents