Similar Projects
Langford Park Project
New Construction
Bidding
$500,000 est. value
Atlanta, GA 30319

Murphy Candler Park Nature Trail
Post-Bid
Brookhaven, GA

Poured In Place Installation and Repair Services
Term Contract
Post-Bid
Atlanta, Decatur, Lithonia, Stone Mountain, Stonecrest, GA 30034

Tennis Courts Repair and Replacement
Results
Atlanta, Decatur, Ellenwood, GA

Basketball Courts Repair and Replacement
Results
Atlanta, Decatur, Ellenwood, GA

Decatur Legacy Park ADA Renovations for Williams and Gillespie Cottages
Renovation
Post-Bid
Decatur, GA 30030

Murphey Candler Park- South Trail
Results
Brookhaven, GA

Decatur Legacy Park Stone Dairy Barn Pavilion Buildout
Build-Out
Post-Bid
$300,000 est. value
Decatur, GA 30030

Johns Homestead Temporary Shoring Project
Results
Tucker, GA 30084

Legacy Park Accessible And Inclusive Playground
Renovation
Post-Bid
Decatur, GA 30030

Murphey Candler Park - Community Green
New Construction
Results
Atlanta, GA 30319

Murphey Candler Park - Multiuse Trail on Dam
New Construction
Post-Bid
$900,000 est. value
Atlanta, GA 30319

Fitzgerald Park Field Improvements
Renovation
Results
Tucker, GA 30084

Lynwood Park Splashpad
Renovation
Results
$8,610,351 est. value
Atlanta, GA 30319

Rosenfeld Park Tennis Court Resurface
Renovation
Results
Stone Mountain, Tucker, GA 30087

Last Updated 06/01/2022 05:30 AM
Project Title

Frazier Rowe Park - Site Preparation, Pavilion Assembly and Installation

Physical Address View project details and contacts
City, State (County) North Decatur, GA 30033   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site preparation for a pavilion to be assembled and installed at Frazier Rowe Park which is located at 2880 LaVista Road, Decatur, GA 30033. Project include, but is not necessarily limited to, the following: labor, material, equipment, erosion control, supervision, transportation, and other related services for completing site preparation, connecting sidewalks and the concrete pad and footings. Sod may be needed to replenish damaged areas from the site preparation. RPCA has purchased, and will provide, the 20’x36’ shelter which will be installed once the site is prepped and the slab and connecting sidewalks are installed. The final location of the concrete pad will be staked on site and approved by RPCA before the slab is formed.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents