Similar Projects
Steam Ethane Cracker and Export Terminal / Beaumont
New Construction, Infrastructure
Conception
$6,000,000,000 CJ est. value
Beaumont, TX 77702

Beaumont Pioneer Crossing / Clubhouse
New Construction, Infrastructure - 2,502 SF
Design
$450,000 CJ est. value
Beaumont, TX 77708

RFQ D/B - Port Arthur and Vicinity( PAV02) Coastal Storm Risk Management (CSRM) - Floodwall Replacement
Infrastructure
Design
$25,000,000 CJ est. value
Port Arthur, TX 77655

Utility Relocations for USACE Hurricane Flood Protection Levee PAV3B
Infrastructure
Bidding
$2,000,000 CJ est. value
Port Arthur, TX 77640

RFP CMAR - Sabine Pass ISD - CTE Building
New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Port Arthur, TX 77655

RFQ Construction Manager at Risk - Allied Health and Sciences Building
New Construction, Infrastructure - 51,500 SF
Post-Bid
$27,595,050 CJ est. value
Port Arthur, TX 77640

Stephen F. Austin Newcomers Center Project
Infrastructure
Post-Bid
$9,000,000 est. value
Port Arthur, TX 77640

Memorial High School Drainage Improvement Project
Infrastructure
Results
$39,300 est. value
Port Arthur, TX 77642

Spindletop Avenue Roadway and Drainage Rehabilitation
Infrastructure
Results
$530,000 est. value
Beaumont, TX 77705

Virginia Flats Apartment Renovations
Infrastructure, Renovation - 92,000 SF
Construction
$6,500,000 CJ est. value
Beaumont, TX 77705

Harmony School
New Construction, Infrastructure - 74,099 SF
Construction
$22,777,214 CJ est. value
Beaumont, TX 77706

Entergy, Beaumont Service Center, Phase 1
New Construction, Infrastructure - 70,773 SF
Pending Verification
$20,000,000 CJ est. value
Beaumont, TX 77708

Sempra Energy Liquefied Natural Gas - Phase 2, Trains 3 & 4 / Port Arthur
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Port Arthur, TX 77640

(CSP) Site Drainage
Infrastructure
Design
$300,000 CJ est. value
Beaumont, TX 77705

Demolition of Five (5) Residential Structures
Demolition, Infrastructure
Bidding
$40,000 CJ est. value
Beaumont, TX 77701

Last Updated 07/05/2023 07:02 AM
Project Title

Doornbos Pond Repairs

Physical Address View project details and contacts
City, State (County) Nederland, TX 77627   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,212,567 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1.1 DESCRIPTION: This item shall consist of the mobilization of personnel, equipment and supplies at the project site in preparation for beginning work on other contract items. 1.2 Mobilization shall include, but is not limited to, the movement of equipment, personnel, material, supplies, etc. to the project site and the establishment of office and other facilities necessary prior to beginning the work. 1.3 MEASUREMENT: Measurement of the Item, "Mobilization" as specified herein will be by the "Lump Sum", as the work progresses. 1.4 PAYMENT: Partial payments of the "Lump Sum" bid for mobilization will be as follows. The adjusted contract amount for construction items as used below is defined as the total contract amount less the lump sum bid for Mobilization. A. When 1% of the adjusted contract amount for construction items is earned, 50% of the mobilization lump sum bid or 5% of the total contract amount, whichever is less, will be paid. B. When 5% of the adjusted contract amount for construction items is earned, 75% of the mobilization lump sum bid or 10% of the total contract amount, whichever is less, will be paid. Previous payment under this item will be deducted from the above amount. C. When 10% of the adjusted contract amount for construction items is earned, 90% of the mobilization lump sum bid or 15% of the total contract amount, whichever is less, will be paid. Previous payments under this item will be deducted from the above amount. D. Upon completion of all work under this contract, payment for the remainder of the lump sum bid for "Mobilization" will be made. E. Partial payments for mobilization will be subject to the same 10% retention as all other items of work.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents