Similar Projects
Piermont Road Daycare Center
New Construction, Demolition - 22,675 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Closter, NJ 07624

Cresthill Academy
Addition
Design
Lyndhurst, NJ 07071

Memorial School Field Improvements
Bidding
South Hackensack, NJ 07602

2020 Carlstadt Roadway Improvement
Bidding
Carlstadt, NJ 07072

Merritt Field Improvements
Post-Bid
Cresskill, NJ

Midland Park and Ho-Ho-Kus Cooperative Resurfacing
Post-Bid
Midland Park, NJ

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Tennis Court Reconstruction at River Dell High School
Results
Less than $360,000 est. value
River Edge, NJ 07661

The River Club
New Construction - 8,000 SF
Construction
$100,000,000 est. value
Bogota, NJ 07603

Daycare Center
New Construction - 8,250 SF
Design
Fair Lawn, NJ 07410

Furnishing and Delivering of Tennis Court Resurfacing for North Monroe Courts and Bellair Courts
Post-Bid
Ridgewood, NJ

Grantwood Park Playground Resurfacing
Results
Cliffside Park, NJ

West Passaic Street Mixed-Use Building
New Construction
Design
Rochelle Park, NJ 07662

Improvements to Columbus Park
Post-Bid
Palisades Park, NJ 07650

Track and Field Upgrades at Ramsey High School
Results
Ramsey, NJ 07446

Last Updated 01/08/2019 02:04 PM
Project Title

Lightbridge Academy

Physical Address View project details and contacts
City, State (County) Hackensack, NJ 07601   (Bergen County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Park/Playground, Pre-School/Daycare
Contracting Method Bids by Invitation.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details Pre-School/Daycare, 2 Stories Above Grade, New Construction, Park/Playground, 4,000 SF New Construction, 32 Parking Spaces, 0.68 Acre.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents