Similar Projects
Village Square - Phase 1
New Construction - 120,000 SF
Conception
$10,000,000 CJ est. value
Holly Springs, NC

Innovation District and Village Square Phase 2
New Construction - 500,000 SF
Conception
$10,000,000 CJ est. value
Holly Springs, NC

Wexford Reserve
New Construction
Design
Wake Forest, NC

Honeycutt Farm
New Construction
Design
Holly Springs, NC

Residential Construction Services
Bidding
Raleigh, NC

Contractors for Emergency Housing Repair Services for Disaster Grants Hurricane Florence
Post-Bid
Raleigh, NC

Developer for Affordable Housing and Transit-Oriented Development
Post-Bid
Cary, NC

Construction Management Services for State`s Hurricane Recovery Program
Results
Raleigh, NC

Stones Residential Townhomes
New Construction - 28,449 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Raleigh, NC 27601

Burell Single Family Home
New Construction - 3,284 SF
Construction
$250,000 est. value
Wendell, NC 27591

Neighborhood District Phase 3
New Construction, Demolition - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Holly Springs, NC

Walter Tower
New Construction
Design
Raleigh, NC 27609

Seaboard Station Mixed Use
New Construction
Post-Bid
$250,000,000 est. value
Raleigh, NC

Averette Subdivision
New Construction
Conception
Wake Forest, NC

Knightdale Station Village
New Construction
Design
Knightdale, NC 27545

Last Updated 03/29/2019 02:12 PM
Project Title

Tryon at Wake Forest

Physical Address View project details and contacts
City, State (County) Wake Forest, NC 27587   (Wake County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes
Contracting Method
Project Status Construction Commenced first quarter 2018
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 247,500 SF - 136 Multi-Family Homes, 2 Stories Above Grade, Approximately 1,800 SF New Construction, 181 Acres, 279 Single-Family Homes, 1 to 2 Stories Above Grade, Approximately 2,700 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents