Similar Projects
Design Build Services for the Shady Side Drive Slope Stabilization Project
Infrastructure
Bidding
$2,000,000 to $3,000,000 est. value
Clayton, GA 30525

Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance Services - District 5
Infrastructure
Bidding

Concrete Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA 30501

Construction of the Lamb Loop Street and Drainage Improvements to Serve the CCBCI Distribution Center
Post-Bid
Less than $725,000 est. value
Tifton, GA 31793

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Smith Street Drainage Improvements
Results
Hagan, GA 30429

Dobbs Road Drainage Improvements
Infrastructure
Bidding
Woodstock, GA

Beechwood Circle Drainage Replacement
Post-Bid
Lawrenceville, GA 30046

Flint River East Outfall Replacement - Phase 1
Results
Morrow, GA 30260

Main Street at Linton Drainage Improvements
Infrastructure
Bidding
Woodstock, GA

Dressler Ditch Improvements
Post-Bid
Rincon, GA 31326

Whitfield Street Drainage Improvements
Results
Smyrna, GA

Ellenton Storm Drainage and Street Improvements
Infrastructure
Bidding
Ellenton, GA

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

Last Updated 11/22/2021 09:10 AM
Project Title

2021 Wrens Way and Lullwater Main Pipe Rehabilitation

Physical Address View project details and contacts
City, State (County) Kennesaw, GA   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the rehabilitation of the pipe segments as shown on the attached exhibits. a. All major utilities: electric, water, communications, gas and sewer are present within the project corridor. Project improvements will require coordination with utilities for locations and any adjustments. b. NPDES monitoring and compliance may be required depending on individual project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents