Similar Projects
Chiller Replacement - Release on or about April 9, 2021.
Design
$250,000 to $500,000 est. value
Beltsville, MD

Gymnasium HVAC Replacement Project
Bidding
Bowie, MD 20716

Replace the Existing Steam Fired Hot Water Generator, at Bldg. #B006
Term Contract
Bidding
$25,000 to $100,000 est. value
Beltsville, MD 20705

NMIC-1 Replace 4 Chillers and Controls/Install Chiller Catwalks Project, National Maritime Intelligence Center, Suitland, Maryland
Post-Bid
$10,000,000 to $25,000,000 est. value
Suitland, MD

RGH Air Condition Unit Replacement
Post-Bid
Laurel, MD 20707

J.E. Proctor Building Chiller Replacement
Results
Bowie, MD 20715

Croom High School HVAC Modernization
Results
Less than $1,700,000 est. value
Cheltenham, MD 20623

HVAC Preventative Maintenance and Service
Post-Bid

Thurgood Marshall Library Cooling Tower Replacement
Results
Bowie, MD 20715

Dust Collection Unit
Post-Bid
Andrews Air Force Base, MD 20762

Recommissioning (ReCx) Repairs Building: BARC 052 Controls
Results
$25,000 to $100,000 est. value
Beltsville, MD 20705

BARC MCquay Range #2 Chiller
Post-Bid
Beltsville, MD 20705

BARC - Overhaul Building 010A Chiller #2
Results
Beltsville, MD 20705

HVAC System Replacement for the 6000- Series
Post-Bid
Greenbelt, MD 20770

Dust Collection Unit
Results
MD 20762

Reported 05/26/2021 12:00 AM
Project Title

Design-Build Services - Boiler Modernization - Beltsville, Maryland

Physical Address View project details and contacts
City, State (County) Beltsville, MD   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

BACKGROUND: The boilers at NAL have far exceeded their service life. The original boilers have outlived their original functional provisions and the employees and staff would benefit from a modernization of the boilers to allow for improved heat and hot water function. REQUIREMENT: This requirement is a design-build effort to replace three (3) existing 5000 MBH Boilers with new high efficiency boilers. It will provide the final design to size the boilers, pumps, hydronic system, lay out the equipment and piping, replace the domestic water system, and eliminate the full height boiler stack. Work planned for this project includes installation of new boilers and appurtenant mechanical equipment, piping, accessories, capping of roof curbs, construction of new concrete equipment pads, and infill of opening in existing exterior concrete wall. The work will be completed while the laboratory remains open. The Bridging Documents will consist of a complete 50% design submission. The Design Build Contractor (DBC) will use these documents as the basis to complete a set of construction documents.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Heating Boilers, Central HVAC Equipment.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents