Similar Projects
Soccer Complex to Coolidge Road - City of East Lansing
Infrastructure
Conception
$600,000 est. value
East Lansing, MI

Bituminous Paving - Charlotte and Grand Ledge Garage
Infrastructure
Bidding
$400,000 CJ est. value
Lansing, MI 48933

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Eastern Athletic Fields Basin Drainage
Post-Bid
Lansing, MI 48912

Excavation and Dirt Moving Services
Term Contract
Results
Mason, MI 48854

Ford River Boating Access Site
Results
Lansing, MI

Wexford Montessori Site Improvements
Infrastructure
Post-Bid
Lansing, MI 48911

Bauer Drain
Results
Stockbridge, MI

Sexton Site Work
Infrastructure
Post-Bid
Lansing, MI 48915

SAR - Demolition and Site Restoration
Demolition
Results
Lansing, Prudenville, MI 48651

Woodland Lake BAS - Site Improvements
Infrastructure
Post-Bid
Lansing, MI

Fibron Trout Pond - Culvert Replacement
Results
Okemos, MI 48823

Drain Cleaning Services for the Ingham County Road Department 3 Locations
Infrastructure
Post-Bid
Mason, MI

SMI Racer Site - Passive Recreation Redevelopment
Results
Lansing, MI

North Elementary Site Improvements
Infrastructure
Results
Lansing, MI 48911

Last Updated 07/22/2022 08:31 AM
Project Title

Dye Reservoir Vegetation Replacement

Physical Address View project details and contacts
City, State (County) Lansing, MI 48933   (Ingham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 22 2022, the project was cancelled. Questions Deadline: 5/23/2022 04:00 PM (ET) The BWL reserves the right to reject any or all Proposals, waive irregularities or technicalities in any Proposal, and accept any Proposal in whole or in part, which in the opinion of the BWL, is in its best interest. The BWL does not limit the methods or factors to be used for evaluation. The Work must adhere to the following specifications/Scope of Work ("Specifications"). 1. Produce rendering of design for approval 2. Remove existing grass a. Chemicals can not be used for this process b. Leave existing trees and bushes 3. Plant agreed upon vegetation 4. Fill in voids between new vegetation with mulch

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Soil Treatment, Vegetation Control.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents