Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

HVAC Engineering/Design for Trudy Resnick Farber Building
Term Contract
Post-Bid
Ellenville, NY 12428

Install Ductless Air Conditioner
Results
Less than $25,000 est. value
Saugerties, NY 12477

Upgrade Lecture Center Mechanical Systems at SUNY New Paltz
Results
$5,000,000 to $10,000,000 est. value
New Paltz, NY 12561

HVAC Replacement for SUNY Ulster Campus
Post-Bid
Marbletown, Stone Ridge, NY 12484

HVAC Replacement for SUNY Ulster Burroughs Hall
Term Contract
Results
Stone Ridge, NY 12484

KHS Kate Walton Field House Pool Dectron RTU Replacement
Post-Bid
Kingston, NY 12401

Smiley Art Building Art Storage AC Upgrade at SUNY New Paltz
Results
New Paltz, NY 12561

Clean & Tunes of Gas and Oil-Fired Furnaces, and Gas and Oil-Fired Water and Steam Boilers
Term Contract
Post-Bid
NY 12401

Ellenville Middle / High School HVAC Improvements
Results
Ellenville, NY 12428

Preventive Maintenance for Automated Logic HVAC Controls
Term Contract
Post-Bid
Kingston, NY 12401

HVAC Control System Upgrade Ulster County Courthouse
Results
Kingston, NY 12402

HVAC/Refrigeration Replacement & Maintenance
Term Contract
Post-Bid

HVAC Maintenance
Term Contract
Results
$50,000 to $500,000 est. value
Highmount, Lake Placid, North Creek, Wilmington, NY

UCLEC Removal and Replacement of Condensing Units
Post-Bid
Kingston, NY 12401

Reported 11/14/2019 12:00 AM
Project Title

FAB Heating Upgrade

Physical Address View project details and contacts
City, State (County) New Paltz, NY 12561   (Ulster County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of providing all labor, supervision, project coordination, tools, equipment, legal removals, and the legal recycling and disposal of all construction waste for the removal of existing, and the installation of a new high temperature hot water (HTHW) fired heat transfer package (including but not limited to (2) pumps, exchanger, expansion tank, glycol feed, air and dirt separator and makeup water connection), piping connections to HTHW and heating hot water (HHW) systems. New bypasses are to be provided on both the HTHW and the HHW side. The project also includes the removal of existing HTHW fired domestic hot water heater and replacement with heat pump hot water heater, including all connections to make up water, heating water recirculation and expansion tank.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents