Similar Projects
Last Updated | 02/27/2019 10:28 AM |
Project Title | High School Music and Spring City Classroom Addition |
Physical Address | View project details and contacts |
City, State (County) | Mount Pleasant, UT 84647 (Sanpete County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | NSHS music room details: Required Elements: 1 - 40'x100' + main entrance added to the North East corner of NSHS Suggestions: 1 - Flat (not terraced) carpeted floor, all levels (main room, practices / storage, loft, office, etc.) 2 - 4'0" x 7'0" emergency egress door, back of main music room to outside, fire sprinklers, etc. 3 - East practice / ensemble rooms and office insulated for sound with double pane windows 4 - Office - floor to ceiling 12" deep, adjustable shelves on north wall, west wall and 4' (from north corner) of east wall with a 4'X2' shelf peninsula centered on the north wall. Also a built in desk, with drawers and 48" tall upper cabinets along the south wall of office 5 - In southeast corner of main music room, a washout area with floor drain, sink and hose bib. Also, counter with upper and base cabinets along the entire south wall of southeast practice room, with sink for instrument repair (water available through the south wall in shower room). 6 - Music room will align with east corner of existing building to expand width of main entry hall 7 - Move current exterior hose bib from east of auditorium, north so its outside of the new entrance. 8 - Stand alone HVAC system is recommended & connection of five additional video cameras. 9 - Southwest wall of upper loft with 3' deep closet with three closet rods for uniform storage. 10 - Water to drain off of north side with gutter (contrast, not match existing exterior finish). 11 - 24" deep shelves on all walls of main floor west storage room, 4' and 6' above the floor 12 - 6" deep 48"X96" trophy case (match existing) on main entry wall of music room 13 - Metal loft railings 4' above upper floor for student safety 14 - Maximum height, 1" thick fiberboard acoustic drop ceiling throughout. Spring City Elementary classroom details: Required Elements: 1 - 30'X 80' added to west end of existing school Suggestions: 1 - 2 - 30' east to west, 32' north to south classrooms, 10' ceilings (no plumbing, no office) 2 - Extend existing hallway 30' to west and extend existing HVAC in ceiling (air-handler per classroom) 3 - Built-in storage similar to existing classrooms on the classroom side of hallway walls. 4 - Carpet, fire sprinklers, wall covering, doors, etc. similar to existing school. | ||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |