Similar Projects
Concrete Pavement Restoration and Replace Superstructure
Infrastructure
Bidding
IN

Parks Paving
Infrastructure
Bidding
Fort Wayne, IN 46808

Information Request from Engineers for the Removal of Asphalt Gore Areas and Replacement
Post-Bid
Fort Wayne, IN 46802

City Utilities Asphalt Cut Repairs
Term Contract
Post-Bid
Fort Wayne, IN

Walnut & Main Streets Improvements
Results
Leo-Cedarville, IN 46765

2020 HMA Resurface Hursh Road
Results
Fort Wayne, IN 46802

Asphalt and Site Work at East Allen Administration Annex Building
Infrastructure
Bidding
New Haven, IN 46774

City Utilities Concrete Cut Repair Service
Term Contract
Post-Bid
Fort Wayne, IN

Road Reconstruction
Results
IN

Sycamore Lakes
Infrastructure
Bidding
Fort Wayne, IN 46818

Lincoln Highway Improvements
Post-Bid
New Haven, IN 46774

Concrete Pad for Vactor Dumping Area
Results
Fort Wayne, IN 46802

EIFS Restoration Work Center Prince Chapman ES
Infrastructure, Alteration
Bidding
New Haven, IN 46774

2021 Helen P. Brown Natatorium Bulkhead Replacement
Post-Bid
Fort Wayne, IN 46806

Northway Drive and Southway Drive Culvert Replacement
Results
Fort Wayne, IN 46800

Last Updated 01/07/2022 10:32 AM
Project Title

Alley Reconstruction - Madison Street, East Jefferson Boulevard, Harmar Street, Division Street

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46895   (Allen County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve existing deteriorated concrete alley by removing and replacing concrete, adjusting grade for proper drainage flow, and reconstruct adjacent alley approaches and sidewalk.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents