Similar Projects
West WWTP Expansion - PH I
Addition
Conception
$1,200,000 est. value
Sugar Land, TX

South Wastewater Oxidation Ditch Rehabilitation - City of Copperas Cove
Renovation
Conception
$637,500 CJ est. value
Copperas Cove, TX 76522

TBWWTP Expansion, Phase II
Addition
Design
$28,820,000 est. value
Temple, TX 76502

CRWS Turbo Blower Installation
Renovation
Design
$1,000,000 CJ est. value
Dallas, TX 75212

Repair of Degasifier
Renovation, Infrastructure
Bidding
$163,000 CJ est. value
Rosharon, TX 77583

Trinity Wellfield Expansion Project -Site Improvements
Infrastructure
Bidding
$4,500,000 CJ est. value
New Braunfels, TX 78132

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,600,000 CJ est. value
Fresno, TX 77545

Wastewater Treatment Plant Rehabilitation
Renovation
Post-Bid
Katy, TX 77494

1.5 Mgd Wastewater Treatment Plant Engineering Design, Permitting
Results
$1,163,573 est. value
Marble Falls, TX 78654

Hankamer - 0.3 MGD Wastewater Treatment Plant Project
New Construction
Results
Hankamer, TX

Elm Fork Water Treatment Plant Filter Complex - Phase I
New Construction, Infrastructure
Construction
$155,100,000 CJ est. value
Carrollton, TX 75006

Water Infrastructure - Riverbend Water Resources District
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
South Texarkana, TX 75501

Headwaters at the Comal / Building A
Demolition, Renovation
Pending Verification
$6,000,000 CJ est. value
New Braunfels, TX 78130

Doe Branch, Phase 3 Wastewater Treatment Plant - Town of Prosper
New Construction, Infrastructure
Conception
$14,500,000 CJ est. value
Prosper, TX 75078

Dos Rios and Leon Creek Wrcs Electrical System Improvements - Phase II
Renovation
Design
$25,400,000 CJ est. value
San Antonio, TX 78205

Last Updated 03/11/2023 04:31 PM
Project Title

Jefferson Street Water Treatment Plant Chlorine Feed Improvements Project

Physical Address View project details and contacts
City, State (County) Laredo, TX 78040   (Webb County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $777,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the furnishing of all necessary materials, machinery, equipment, labor, superintendence, and all other services and appurtenances required for the Jefferson St. WTP Chlorine Feed Improvements. The scope of this project is to modify the Chlorine Solution (CLS) Injection Systems at the Jefferson Water Treatment Plant in Laredo, Texas. One Chlorine Injection Point shall be transferred from the rapid mix building to an exiting injection point, upstream of the rapid mix building upgrading existing 3" PVC piping to 4" Chlorinated PVC (CPVC). A second CLS pipe segment shall be upgraded from 3" PVC to 3" CPVC. All new pipe segments shall be laid in duplicate for redundancy. Bids shall be based on Base Bid and shall include dollar amount for improvements including those items listed as alternatives as per the Schedule of Values included in the specifications of this project. Submit completed Schedule of Values form with the Base Bid. Each proposal and the proposal guaranty must be originals and must be sealed in an envelope plainly marked with the name of the project as shown above, and the name and address of the Bidder. When submitted by mail, this envelope shall be placed in another envelope addressed as indicated in this Notice to Bidders. Only proposals and proposal guaranties actually in the hands of the designated official at the time set in this Notice to Bidders shall be considered. Proposals submitted by telephone, telegraph, or fax, will not be considered. Bidders are expressly advised to review Section C-3.10 of the General Conditions of the proposed Contract as to the causes which may lead to the disqualification of a bidder and/or the rejection of a bid proposal. Unless all bids rejected. Owner agrees to give Notice of Award of Contract to the successful bidder within sixty (60) days from the date of the bid opening. Bidders are expected to inspect the site of the work and inform themselves regarding all local conditions. The City is not responsible for bids not being delivered in a timely manner. Bidders are encouraged to drop-off manual sealed bids personally, and wait for confirmation from the City Secretary's Office that the bid has been received.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents