Similar Projects
Tunnel 5 - Replacement of Check Structure Inlet and Tunnel Inlet Structures. Navajo Indian Irrigation Project (NIIP)
Results
$500,000 to $1,000,000 est. value
Farmington, NM

3438 Tunnel System Repair Phase V-Stewart
Results
Less than $652,068 est. value
Las Cruces, NM

Jemez Mountain Watershed Restoration
Results
Los Alamos, NM 87544

Construction Of Acequia De Los Ortiz De Nambe Steel Sheet Pile Diversion Dam
Post-Bid
Santa Fe, NM

Cookes Peak West Mine Safeguard Project-Phase IIIb
Results
Less than $370,215 est. value
Deming, NM

Lisboa Diversion Dam Replacement
Results
Pecos, NM

Design and Construction of a New Ditch Diversion
New Construction
Post-Bid
Turley, NM

Tunnel Repairs Phase VI - A
Results
Las Cruces, NM

MB Community Ditch Association Rio Chamita Diversion Dam Project
Renovation
Post-Bid
Chama, NM

3735 Tunnel Repairs Phase VI-B
Renovation
Bidding
Las Cruces, NM

Reported 06/18/2020 12:00 AM
Project Title

Construction: Tunneling/Earthwork

Physical Address View project details and contacts
City, State (County) Las Cruces, NM   (Dona Ana County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description of type of work – Tunneling/Earthwork: Drill and blast tunnels with diameters ranging from 5ft. to 30ft and lengths ranging from 50ft. – 800ft; may be D shape or circular profile; may include vent shafts; may require shotcrete and rock bolt portal; may require shotcrete tunnel liner with welded wire fabric and rock bolts; may include installation of steel sets; may require excavation of overburden to specified elevation (overburden may be relatively thin, down to 15 ft.); be required to provide tunnel rescue teams per OSHA and adequate ventilation; may be required to bore holes from tunnel to the surface; may require drilling of instrumentation holes in the tunnel liner; may be required to perform LIDAR surveys of both the tunnel and the surface excavation; excavation may be required to be within 6” of theoretical profile.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents