Similar Projects
Albuquerque International Sunport Taxiway E Reconstruction, Phase B
Post-Bid
Albuquerque, NM 87106

Design Build (DB) Construction Services to Reconstruct Main Operation Apron at Cannon AFB, NM
Post-Bid
$5,000,000 to $10,000,000 est. value
NM

Las Cruces International Airport Terminal Apron Reconstruction
Results
Less than $2,100,000 est. value
Las Cruces, NM 88001

Runway 20 Runway Safety Area (RSA) Grading
Results
$869,506 est. value
Santa Fe, NM

Airfield Rubber Removal, Airfield Paint Removal, and Airfield Re-Striping (R3) Sources Sought
Post-Bid
Hondo, NM

Taxiway A Pavement Maintenance
Results
$115,354 est. value
Portales, NM 88130

Bid Project Kirtland AFB, NM-Repair Pad 3 Taxiway H and Apron B
Post-Bid
$5,000,000 to $10,000,000 est. value
Albuquerque, NM

Lea County Zip Franklin Memorial Airport Precision
Results
Lovington, NM 88260

Jicarilla Apache Nation Airport Runway 17-35 Rehabilitation
Post-Bid
Dulce, NM 87528

Raton Municipal Airport Precision Approach Path Indicator
Results
Raton, NM 87740

Repair Taxiway Delta & Mike
Post-Bid
$10,000,000 est. value
Clovis, NM

Hatch Municipal Airport Pavement Rehabilitation
Results
$350,000 to $450,000 est. value
Hatch, NM 87937

Colfax County Airport at Angel Fire Runway 17-35 Pavement Sealing
Results
Raton, NM 87740

Silver City Airport Improvements-2020 Rehabilitate/Reconstruct Taxiways and Aprons
Results
$2,175,734 est. value
Silver City, NM 88061

Moriarty Municipal Airport Runway 26 Precision Approach Path Indicator
Results
Moriarty, NM 87035

Reported 03/11/2021 12:00 AM
Project Title

Design-Bid-Build, Construction Services to Reconstruct Apron A at Kirtland AFB, NM

Physical Address View project details and contacts
City, State (County) Kirtland, NM   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Design-Build.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the full depth reconstruction of Apron A at the Kirtland AFB, New Mexico. Apron A comprises of Apron A East and Apron A West. Apron A West will consist of approximately 351,245 sq. ft of 14" of Portland cement concrete (PCC) over 6" of aggregate base (AB). Apron A East will consist of approximately 178,233 sq ft of 5" of hot-mix asphalt (HMA) over 9" of AB. The apron shoulders will consist of 3" of HMA over 6" of AB. Also included in the project is the removal and replacement of the Aero Club Taxiway and West Access Apron consisting of 67713 sq. ft of 4" of HMA over 6" of AB. Other project items include the replacement of the existing fire retardant fill points, existing storm drainage network, aircraft tie-down points, and other required incidental related work.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents