Similar Projects
Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Bituminous Surfacing, TMS, ADA Improvements and Traffic Signal System
Infrastructure
Bidding
MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Bidding

2021 Local Street Improvements
Post-Bid
International Falls, MN

Park Forest Road East Graveling and Culvert Replacement
Post-Bid
MN 55712

Blacktop Installation, Maintenance, Painting and Repair
Results
MN

GLSSWD Existing Gravity Filter Rehabilitation
Results
Spicer, MN

2021 Parking Structure Rehabilitation
Construction
$2,408,193 est. value
Minneapolis, Saint Paul, MN 55111

Bituminous Reclamation, Aggregate Base Class 5, Bituminous Paving, Class 1 Shouldering
Infrastructure
Bidding
MN

Downtown M&O and General Sidewalk
Term Contract
Post-Bid
Saint Paul, MN

Northwood Drive Sanitary Sewer Lining
New Construction
Results
Redwood Falls, MN

2022 Street and Utility Improvement
Infrastructure
Bidding
North Saint Paul, MN

2021 Cracking Sealing and 2021 Parking Lot Chip Sealing
Post-Bid
Brainerd, MN

2021 Bituminous Resurfacing
Results
$620,303 est. value
Marshall, MN

LRT Paver Replacement - Target Field Station (TFS1) and Warehouse Platforms
Infrastructure
Bidding
Minneapolis, MN

Last Updated 01/28/2022 02:49 AM
Project Title

County Roadway Improvements and City of Plummer Sanitary Improvements

Physical Address View project details and contacts
City, State (County) Plummer, MN 56748   (Red Lake County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Roadway Lighting, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Location: Located on Minnesota Street, Central Avenue, Ash Street, Red Lake Avenue, and Poplar Street in Plummer, MN. Bituminous Paving, ADA Improvements, Grading, Storm Sewer Replacement, Sanitary Sewer Replacement, Watermain Replacement, and Lighting

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents