Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Owensboro Health Regional Hospital
Renovation - 781,000 SF
Post-Bid
Owensboro, KY 42303

Correct Life Safety Deficiencies
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Louisville, KY 40206

VA Medical Center (VAMC)
New Construction
Results
$500,000,000 to $705,000,000 est. value
Louisville, KY

UKHC KCH Teen Room
Renovation
Results
$400,000 est. value
Lexington, KY 40536

Signature Healthcare of Elizabethtown
New Construction, Renovation
Construction
$22,000,000 est. value
Elizabethtown, KY 42701

TriStar Greenview Hospital Emergency Room Low Acuity Unit
Renovation
Construction
Bowling Green, KY 42104

Bluegrass Parkway Rehabilitation Hospital Development
New Construction, Infrastructure - 48,000 SF
Pending Verification
$41,700,000 CJ est. value
Louisville, KY 40299

UofL Health Medical Center South
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Shepherdsville, KY 40165

RFP Construction Manager - Construct Ambulatory Facility - Cancer Treatment Center/ Ambulatory Surgery Center
New Construction, Infrastructure - 260,000 SF
Bidding
$41,500,000 CJ est. value
Lexington, KY 40536

Correct Pharmacy Physical Security
Renovation
Post-Bid
$250,000 to $500,000 est. value
Louisville, KY

Kentucky Correctional Psychiatric Center Break Rest Areas Demolition and Replacement
New Construction, Infrastructure
Results
$129,267 est. value
La Grange, KY 40031

Norton Healthcare Hospital at Opportunity Campus
New Construction, Infrastructure - 60,000 SF
Construction
$70,000,000 CJ est. value
Louisville, KY 40211

Baptist Health Central Pharmacy
New Construction, Infrastructure - 90,000 SF
Pending Verification
$40,000,000 CJ est. value
La Grange, KY 40031

Last Updated 12/07/2022 08:04 PM
Project Title

PAV G Replace VAC and WAGD

Physical Address View project details and contacts
City, State (County) Lexington, KY 40536   (Fayette County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $122,300 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 12,2022, this project has not yet been awarded. A timeline for award has not yet been established. This Project is to Replace the WAG and VAC system in Gill Heart and Vascular Institution, including controls BACNET ove IP. Furnishing of all labor, materials, supplies, tools, appliances, equipment, services, etc., necessary for the construction of PROJECT: #CCK-2624-22 PAV G Replace VAC and WAGD, as set forth in the specifications and as shown on the drawings for as prepared by UK- Planning, Design and Construction Services and approved by the Construction Procurement Section and under the terms and conditions of this Invitation. Bids will be received from Prime Contractors on a Lump Sum Amount for the total project. All phases of the work shall be bid to and through the Prime Contractors. Bids shall be submitted in the manner herein described and on the official proposal form included with the conditions and specifications and shall be subject to all the conditions as set forth and described in the Bid Documents. Bids shall be submitted only on the Official Forms supplied by the University of Kentucky, Construction Procurement Section. Failure to comply with the foregoing requirements will be cause for invalidation of bid. Final award of Contract will be made on the basis of the lowest, responsive and responsible bid which offers the best value. The time for Substantial Completion as further defined in Article 1 of the General Conditions shall be two (2) weeks from receipt of equipment, and Final Completion shall be thirty (30) days thereafter. Substantial Completion will include all site restoration completed, site clean-up and fully functional. All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. Payments for Plans, Specifications and Official Bid Documents must be made to Lynn Imaging before a set of documents will be issued. Notes: Contractors that receive plans and specifications from other sources than Lynn Imaging must request a "Form of Proposal" from the University's Purchasing Representative to be registered as plan holders and to receive addendums. Potential Contractors must identify the position of their firm as a prime bidder, miscellaneous subcontractor, material supplier or other when ordering of picking up Plans and Specifications. The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served. Anyone wishing to discuss specific items is requested to submit the items in writing to Mike Guyette Construction Procurement, no later than Tuesday April 12, 2022 by 1 PM. Written questions can be submitted by email to: cckbidquestions@uky.edu Note: Responses to Written Questions will be provided in an addendum.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents