Similar Projects
Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Construction of a Bridge and Approaches on US 41/SR 3 North and Southbound Over SR 293 and Csx Railroad
Demolition, New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Cartersville, GA 30121

Construction of a Bridge and Approaches on US 41/SR 3 North and Southbound Over SR 293 and Csx Railroad
Demolition, New Construction, Infrastructure
Bidding
$8,000,000 CJ est. value
Cartersville, GA 30121

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cassville-White Road and I-75 Water Main Relocation
Infrastructure
Results
GA

Chitwood Cove Road Water Relocation
Infrastructure
Results
$650,000 est. value
GA

New Mission Road Elementary School
New Construction, Infrastructure - 102,635 SF
Construction
$30,000,000 CJ est. value
Cartersville, GA 30120

Dogwood Plaza / Adairsville
New Construction, Infrastructure - 7,260 SF
Construction
$1,500,000 CJ est. value
Adairsville, GA 30103

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

North Bartow Interchange Feasibility Study (New I75 interchange) - Bartow County
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cartersville, GA 30120

SR 3 / US 41 SB at SR 293 / CSX #340429d in Emerson
Demolition, New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cartersville, GA 30121

Great Valley Parkway Extension
Infrastructure
Bidding
$2,000,000 CJ est. value
White, GA 30184

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Last Updated 04/06/2023 11:31 PM
Project Title

West Avenue Sewer Replacement Project

Physical Address View project details and contacts
City, State (County) Cartersville, GA 30120   (Bartow County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $131,872 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 5, 2023. The project has been awarded with the amount of $131,872.42. The City of Cartersville is bidding out the replacement of an existing sanitary sewer in West Avenue. See below for all the information that you might need for this bed request. If you have any questions, please call or email me. I will put out a project request email once a week until the let date to ensure that all the bidders have the same information to bid on. For any questions, please contact Brent Beck, 770-607-1166/bbeck@cityofcartersville.org Replacement of 150 lf of existing 8 VCP with 8 PVC. Asphalt Replacement Contractor to provide, in the bid price, the replacement of the asphalt that is removed for construction. Area is shown on the construction plans. Asphalt is to be replaced from edge of pavement to edge of pavement and from ex manhole 1 to ex manhole 2. Concrete can be poured flush and then milled down for asphalt paving. Asphalt striping will be applied after construction and paving. Striping is to meet the Cartersville Public Works regulations. Match existing striping location and color. Trench backfill is to be GAB and tamped to 95% compaction. Any valve boxes for utilities are to be raised if needed to be flush with the new pavement. Traffic Control will be required. Road closures can only be between the hours of 9:00 am -4:00 pm. Prior to any road closure, contact Wade Wilson, 770-383-1432, with the Cartersville Public Works Department. At the end of each day, trench is to be backfilled and plated/made safe in accordance to the Cartersville Public Works regulations. Existing Sewer will be abandoned in place and plugged on both ends. Existing manholes are to be used. New boots will be required in the manholes. For any questions, please contact Brent Beck, 770-607-1166/bbeck@cityofcartersville.org All questions will be answered once a week and set out to all bidders to ensure fair bidding. Prior to any construction, contractor must pothole down on all existing utilities to verify depth.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents