Similar Projects
Affordable Housing
New Construction
Design
Milwaukee, WI 53201

Remodeling & Repairs of 2862-2864 South 35th Street
Bidding
Milwaukee, WI 53215

Remodeling and Repairs at 4946 North 44th Street
Renovation
Bidding
Milwaukee, WI 53218

2846 North Frederick Avenue Single Family Residence
Post-Bid
Milwaukee, WI 53211

Remodeling and Repairs for 4250 North 29th Street
Renovation
Post-Bid
Milwaukee, WI 53216

Lakeshore Commons
New Construction
Pending Verification
Oak Creek, WI 53154

Remodeling and Repairs at 4148 North 17th Street
Renovation
Post-Bid
Milwaukee, WI 53209

Roessgers Property Remodeling
Renovation, Addition
Post-Bid
Milwaukee, WI 53204

Remodeling and Repairs at 6065 North 35th Street
Renovation
Post-Bid
Milwaukee, WI 53209

Remodeling and Repairs at 4900 North 63rd Street
Renovation
Post-Bid
Milwaukee, WI 53218

Remodeling and Repairs at 3236-3238 North Holton Street
Renovation
Post-Bid
Milwaukee, WI 53202

Remodeling and Repairs at 8302 West Congress Street
Post-Bid
Milwaukee, WI 53218

Remodeling and Repairs at 5023 North 38th Street
Renovation
Post-Bid
Milwaukee, WI 53202

Remodeling and Repairs at 2215 North 16th Street
Renovation
Post-Bid
Milwaukee, WI 53205

Remodeling and Repairs at 4708 North 90th Street
Renovation
Post-Bid
Milwaukee, WI 53225

Last Updated 06/25/2021 12:32 PM
Project Title

General Contracting - Housing Infrastructure

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53208   (Milwaukee County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of the roofing system shall be in accordance with this specification and the installation instructions printed by the manufacturer, as written on the back of each shingle bundle. Should the requirements of this specification conflict with those of the shingle manufacturer, the contractor is to notify DCD, but follow the shingle manufacturer instructions to ensure the availability of the required warranty coverage. However, where the shingle manufacturer's printed instructions offer options; e.g., the permitted use of nails or staples in the application of shingles, the contractor shall follow the requirements of this specification; i.e., the use of nails is mandatory. 2. The contract shall include all labor, materials and incidentals necessary to complete the work in a neat and acceptable manner-weather-tight in every respect--including, but not limited to, the following: a. Repairs to and/or replacement of deteriorated roof decking; b. Repairs to and/or replacement of damaged and deficient flashings; i.e., wall and valley flashings; c. Reset, repair and/or replacement of all associated roof flashings, including those located at chimneys, roof curbs, masonry walls, parapets, plumbing vents, etc. d. Tear-off existing roofing materials, site cleanup and hauling away, including all dump fees e. Removal and replacement of all continuous ridge ventilators, where existent, with new prefinished aluminum, or shingle covered, continuous ridge ventilators; f. Installation of polystyrene attic rafter air vents (baffles), one between each truss/rafter space along eaves where none currently exist; g. Removal and replacement of deteriorated sections of gutters and downspouts, including replacement of missing components. h. Furnishing certificates of shingle manufacturer's warranty, and workmanship guarantee; and

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents