Similar Projects
Last Updated 03/20/2019 12:26 PM
Project Title

48-in Finished Water Meter and Vault Replacement

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The following Project description is for general information only and should not be construed to be a complete description of all Work required. Reference should be made to the construction drawings and technical specifications, along with the General Conditions. The project consists of demolishing the existing meter vault and Venturi meter and replacing both. The existing vault shall be replaced by a precast vault with a double access door. The vault shall include an access ladder, sump pump, and a convenience receptacle. The new magnetic meter shall have 2" corporation stops upstream and downstream for testing and calibration. The pressure transmitter that is in the existing vault shall be kept and reinstalled in the new vault. A new electrical service and instrumentation and controls shall be provided for the meter, pressure transmitter and sump pump.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents