Similar Projects
Last Updated | 03/20/2019 12:26 PM |
Project Title | 48-in Finished Water Meter and Vault Replacement |
Physical Address | View project details and contacts |
City, State (County) | West Palm Beach, FL (Palm Beach County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The following Project description is for general information only and should not be construed to be a complete description of all Work required. Reference should be made to the construction drawings and technical specifications, along with the General Conditions. The project consists of demolishing the existing meter vault and Venturi meter and replacing both. The existing vault shall be replaced by a precast vault with a double access door. The vault shall include an access ladder, sump pump, and a convenience receptacle. The new magnetic meter shall have 2" corporation stops upstream and downstream for testing and calibration. The pressure transmitter that is in the existing vault shall be kept and reinstalled in the new vault. A new electrical service and instrumentation and controls shall be provided for the meter, pressure transmitter and sump pump. | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |