Similar Projects
Chip Seal Surfacing with 3/8” Granite
Infrastructure
Bidding
Cleveland, WI

Camp Vits Parking Lot and Trail
Infrastructure
Bidding
Manitowoc, WI

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Elkhart Lake - Kiel, South County Line - STH 32/57; Plymouth - Kiel, Suhrke Road - North County Line
Results
Elkhart Lake, Kiel, WI 53042

Parking Lot Construction (700 Blk York Street)
Infrastructure
Bidding
Manitowoc, WI 54220

2021 Cold-In-Place Asphalt Recycling
Post-Bid
Manitowoc, WI

Manitowoc - Green Bay, SCl - NCl
Results
Green Bay, Manitowoc, WI 54220

Camp Vits Bridge Supply and Install
New Construction, Infrastructure
Bidding
Manitowoc, WI

2021 Lateral Replacement
Post-Bid
Two Rivers, WI

Chilton - Valders, STH 67 - Roosevelt Street
Results
Chilton, Valders, WI 53014

Portland Cement Concrete Road Reconstruction
Post-Bid
Two Rivers, WI 54241

2021 Road Improvements (TRID)
Results
Less than $480,000 est. value
Two Creeks, WI

Hot Mix Paving
Post-Bid
Reedsville, WI 54230

Last Updated 06/04/2021 02:34 PM
Project Title

Concrete Paving II Custer Street Reconstruction

Physical Address View project details and contacts
City, State (County) Manitowoc, WI 54220   (Manitowoc County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The reconstruction work on Custer Street includes pavement removal, grading, graveling, fine grading, doweled concrete pavement with integral curb, concrete driveways, replacement of concrete sidewalks at intersections, replacing and reconstruction of storm sewer structures, installing new storm sewer pipes and structures, reconstructing sanitary manholes, relaying sanitary sewer, and water main replacement. The project also includes lawn restoration, pavement markings and new street signs. This contract, WS-21-17, consists of the Reconstruction of Custer Street from 111 feet East of South 29th Street to 595 feet East of South 29th Street. This project will be 100% funded by the City of Manitowoc. The City Funded project (or Non-CDGB Project) begins at Station 11+11.87 and ends at Station 15+95

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents